My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2312 W CASINO RD 2020 Plans 2022-11-04
>
Address Records
>
W CASINO RD
>
2312
>
Plans
>
2312 W CASINO RD 2020 Plans 2022-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 9:20:52 AM
Creation date
5/11/2022 12:03:21 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2312
Permit
PW2003-010
Year
2020
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EROSION/SEDIMENTATION <br />J <br />h �} <br />s ; <br />i <br />F q CONTROL <br />g NOTES <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BINSTALLED AT THE <br />— <br />BEGINNING - CONSTRUCTION i MAINTAINED FOR THE DURATION <br />THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE <br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE <br />PROJECT. <br />ENTERING10THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br />REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />A WATER Bi - PROPOSED BP FAIL. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE A DAYS FROM <br />A rr: AND FOR NO MORE THAN — DAYS MAY 1 THROUGH <br />Sw <br />1p <br />cei <br />c� <br />cv <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, <br />OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND <br />ACCEPTED BY THE CITY OF EVERETT. <br />MUNICIPAL <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT <br />DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE <br />SPECIFICATIONS FOR ROAD, BRIDGE, AND <br />CONSTRUCTION <br />- STANDARD.. (CURRENT <br />r.:_ <br />EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED <br />FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE <br />CONTRACTOR SHALLBE RESPONSIBLE FOn VERIFICATION <br />O LOCATIONS <br />f TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. <br />CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY <br />CHANGES REQUIRED SHALL .. APPROVED BY THE CITY <br />ENGINEER PRIOR <br />TO COMMENCEMENT OF __AEi CONSTRUCTION <br />ON ! <br />STORM4. ALL - PUBLICRIGHT-OF-WAY <br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR <br />TO STARTING CONSTRUCTION. <br />CATCH5. ALL BASIN t.... STENCILEDOR STAMPED "DUMP ! <br />WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR <br />WETLAND.` ! APPROPRIATE FEATURE FOR THE PROJECT <br />r 3. - <br />G i — 3 F <br />1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY <br />MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO <br />SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF <br />SATISFACTORY BACTERIOLOGICAL TEST RESULTS. <br />2. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND CITY OF <br />EVERETT PUBLIC WORKS DEPARTMENT PRIOR TO THE CONNECTIONS TO <br />AND TAPS ON EXISTING MAINS, AND INSTALLING THE PIV AND FDC. THE <br />PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS <br />DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT <br />SHALL THEREAFTER DETERMINE THE DATE AND TIME AT WHICH THE <br />CONNECTION SMALL BE MADE. <br />3. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT <br />STANDARDS. <br />4. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO <br />THE START OF CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS <br />CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 FOURS PRIOR <br />TO COMMENCEMENT OF CONSTRUCTION. <br />5. THE CONTRACTOR SMALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A <br />PERSON WHO CAN BE CONTACTED REGARDING PROBLEMS DURING <br />CONSTRUCTION ON A 24 HOUR BASIS, <br />6, MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 13 INCHES VERTICAL <br />SEPARATION BETWEEN POTABLE AND NON -POTABLE CONVEYANCE <br />SYSTEMS. <br />7. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS <br />DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL <br />BE ACCESSIBLE AT ALL TIMES <br />I) - <br />Know what's below. <br />'` before <br />Cftak <br />.gr. 'A mi� <br />®tak Architects, Inc. <br />303 SW Third Avenue, Suite 300 <br />Portland, OR 97204 <br />main 503,287.6325 <br />www.otak.com <br />m <br />STAMP <br />CONSULTANT <br />TITLE <br /># DATE DESCRIPTION <br />REVISIONS <br />MS, BS, AL, EN MDC <br />DRAWN BY CHECK BY <br />100% ISSUE SET/BID SET <br />STATUS <br />4/17/2020 <br />DATE <br />323301 <br />saffiffiffiffaligm <br />
The URL can be used to link to this page
Your browser does not support the video tag.