My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These key personnel, all of whom were named in Design-Builder's proposal submitted in response to the <br /> Owner's Request for Qualifications and Proposals for the Project, will be assigned to the Project. Except <br /> in the event of the death of the employee or their termination of employment with Design-Builder, these key <br /> personnel shall remain assigned for the duration of the Project unless otherwise agreed to in writing by the <br /> Owner in its sole discretion. In the event Design-Builder proposes to substitute any of the key personnel <br /> due to death or employment termination, the individual(s) proposed must demonstrate the qualifications <br /> indicated in the Request for Proposals for their respective role(s), and experience as required to <br /> successfully perform such duties. Owner shall have the sole right to determine whether key personnel <br /> proposed as substitutes are qualified to work on the Project. Design-Builder will remove from the Project <br /> any personnel assigned to the Project if, after the matter has been thoroughly considered by Owner and <br /> Design-Builder, Owner considers such removal necessary and in the best interest of the Project, and Owner <br /> so notifies Design-Builder in writing and allows a reasonable period of time for the transition to different <br /> personnel. <br /> 10.4 Key Firms. Design-Builder has been selected for this Project on the basis of not only its <br /> qualifications as a corporate entity, but also upon the basis of the qualifications of the key firms it intends <br /> to engage to perform the Work. Design-Builder agrees to engage such firms to perform the required <br /> services under this Contract, including the key firms identified below: <br /> Firm Role <br /> IMCO General Contractors Design-Builder, General Contractor <br /> Kennedy Jenks Consultants, Inc. Design, Engineer of Record <br /> GeoEngineers Geotechnical Engineer, Hydrologists <br /> These key firms, all of whom were named in Design-Builder proposal submitted in response to the Owner's <br /> Request for Qualifications and Proposals for the Project, will be engaged on the Project. These key firms <br /> shall be engaged for the complete scope identified in the Design-Builder's proposal. In the event Design- <br /> Builder proposes to substitute any of the key firms, Design-Builder shall demonstrate that the replacement <br /> firm possesses sufficient qualifications to perform the Work in question. Owner shall have the sole right to <br /> determine whether key firm proposed as substitutes is qualified to work on the Project. <br /> Article 11 <br /> Bonds and Insurance <br /> 11.1 Design-Builder's Insurance. Unless a longer period of coverage is specified elsewhere in this <br /> Article 11, Design-Builder shall obtain and keep in force the following insurance coverages for a period of <br /> 365 days from Substantial Completion of all Work with insurance companies approved by the State <br /> Insurance Commissioner pursuant to Title 48 RCW. All policies will name the City of Everett, its officers, <br /> employees and agents as additional insureds, with the exception of the Design-Builder's Professional <br /> Liability policy. Prior to Design-Builder commencing any work, Design-Builder shall provide the Owner with <br /> copies of insurance certificates and additional insured endorsements, all in a form acceptable to the Owner. <br /> The insurance provided must be with an insurance company with a rating of A-: VII or higher in the A.M. <br /> Best's Key Rating Guide,which is licensed to do business in the state of Washington (or issued as a surplus <br /> line by a Washington Surplus lines broker). Owner reserves the right to approve the security of the <br /> insurance provided, the company, terms and coverage, the certificates of insurance, and endorsements <br /> and reserves the right to obtain copies of all policies from Design-Builder upon request. <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.