My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 10 <br /> Representatives of the Parties <br /> 10.1 Owner's Representatives. <br /> 10.1.1 Owner designates the individual listed below as its Senior Representative("Owner's Senior <br /> Representative"), which individual has the authority and responsibility for avoiding and resolving disputes <br /> under Section 10.7.2 of the General Conditions to the extent permitted by the Legal Requirements: <br /> John Nottingham, PE, 3200 Cedar St, Everett, WA 98201 <br /> 10.1.2 Owner designates the individual listed below as its Owner's Representative, which <br /> individual has the authority and responsibility set forth in Section 3.3 of the General Conditions to the extent <br /> permitted by the Legal Requirements: <br /> Bill Fisher, 3200 Cedar St, Everett, WA 98201 <br /> 10.2 Design-Builder's Representatives. <br /> 10.2.1 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br /> Senior Representative ("Design-Builder's Senior Representative"), which individual has the <br /> authority and responsibility for avoiding and resolving disputes under Section 10.7.2 of the General <br /> Conditions. <br /> 10.2.2 Design-Builder designates the individual listed in the table in Section 10.3 below as its <br /> Design-Builder's Representative, which individual has the authority and responsibility set forth in <br /> Section 2.1.1 of the General Conditions. <br /> 10.3 Key Personnel. Design-Builder has been selected for this Project on the basis of not only its <br /> qualifications as a corporate entity, but also upon the basis of the qualifications of the key personnel it <br /> intends to employ to perform the Work. Design-Builder agrees to provide all professional personnel <br /> necessary, at adequate staffing levels, to perform the required services under this Contract, including the <br /> key personnel identified below: <br /> Position Title Name of Individual <br /> Design-Builder Senior Representative/ Project CJ Handforth <br /> Manager <br /> Design-Builder Representative/ Preconstruction Todd Pike, DBIA <br /> Manager <br /> Design Manager Chris Stoll, PE, PMP <br /> Structural Engineer PJ Bourdaniotis, PE, SE, DBIA <br /> Civil Engineer Nathan Ward, PE <br /> Building Mechanical Engineer Ryan Ray, PE <br /> Process Mechanical Engineer Jonathan Anderson, PE <br /> Construction Project Manager Mitchell Sorestad <br /> Construction Superintendent James Janda <br /> Geotechnical Engineer Deb Overbay, PE <br /> Hydrogeologist Steven Thomas, LHG <br /> PROGRESSIVE DESIGN-BUILD CONTRACT,Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.