Laserfiche WebLink
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Exhibit A.List of Reference Documents <br /> Document <br /> Document Title <br /> Number <br /> 11 City of Everett Clearwell No. 2 As-Built Plans, Carollo, 2007 <br /> 12 Geotechnical Report Proposed Water Filtration Plant Lake Chaplain, Washington. <br /> Shannon and Wilson, Inc., 1981 <br /> 13 Lake Chaplain South Dam Seismic Upgrade Bore Logs, Dames and Moore, 1999 <br /> 14 Everett Water Filtration Plant Hypochlorite Building Technical Memorandum, HWA <br /> Geosciences, Inc., 2004 <br /> 15 Report of Geotechnical Explorations for Proposed Modifications to Everett Finished <br /> Water Pump Station, Nelson-Couvrette and Associates, Inc., 1996 <br /> 16 Geotechnical Report for Preliminary Design of City of Everett Proposed Clearwell <br /> No. 2 Project, Shannon and Wilson, Inc., 2006 <br /> 17 Draft Geotechnical Report Lake Chaplain Filtration Plant Emergency Generator <br /> Replacement, HWA Geosciences, Inc., 2017 <br /> 18 Water Filtration Plant Civil Pipe Model (PDF), City of Everett <br /> 19 Alum Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> 20 Polymer Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> 21 Fluoride Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> Page 3 of 4 <br />