My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Exhibit A.List of Reference Documents <br /> Document <br /> Document Title <br /> Number <br /> 11 City of Everett Clearwell No. 2 As-Built Plans, Carollo, 2007 <br /> 12 Geotechnical Report Proposed Water Filtration Plant Lake Chaplain, Washington. <br /> Shannon and Wilson, Inc., 1981 <br /> 13 Lake Chaplain South Dam Seismic Upgrade Bore Logs, Dames and Moore, 1999 <br /> 14 Everett Water Filtration Plant Hypochlorite Building Technical Memorandum, HWA <br /> Geosciences, Inc., 2004 <br /> 15 Report of Geotechnical Explorations for Proposed Modifications to Everett Finished <br /> Water Pump Station, Nelson-Couvrette and Associates, Inc., 1996 <br /> 16 Geotechnical Report for Preliminary Design of City of Everett Proposed Clearwell <br /> No. 2 Project, Shannon and Wilson, Inc., 2006 <br /> 17 Draft Geotechnical Report Lake Chaplain Filtration Plant Emergency Generator <br /> Replacement, HWA Geosciences, Inc., 2017 <br /> 18 Water Filtration Plant Civil Pipe Model (PDF), City of Everett <br /> 19 Alum Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> 20 Polymer Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> 21 Fluoride Storage Tank Calculation Summary, Brown and Caldwell, Inc., 2021 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.