My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract l Exhibit A. List of Reference Documents <br /> • Reference Document 18, as numbered in the table below, may not be relied on by the <br /> Design-Builder for: <br /> o Determining the specific locations of any existing underground infrastructure. <br /> o Determining dimensions for which accuracy is critical in determining suitable <br /> fabrication tolerances, worker access, equipment access and operation, purchased <br /> or fabricated materials dimensions, and/or construction means and methods. <br /> • Reference Documents 19, 20, and 21, as numbered in the table below, may solely be <br /> relied on by the Design-Builder for: <br /> o Information regarding preliminary chemical storage tank sizing as computed during <br /> the 2020 Water Filter Plant Facilities Plan project. <br /> o Sizing estimates are based on a 20-year (2020-2040) planning horizon and use <br /> design flows equal to projected peak facility flows in the year 2040 as estimated in <br /> the 2020 Comprehensive Water Plan (HDR, 2020). <br /> Document <br /> Document Title <br /> Number <br /> 1 Everett Water Filtration Plant Capital Improvement Program Report, Brown and <br /> Caldwell, Inc., 2021 <br /> 2 Everett Water Filtration Plant Condition Assessment Report, Brown and Caldwell, <br /> Inc., 2020 <br /> 3 Everett Water Filtration Plant Hydraulic Profile Assessment Technical Memorandum, <br /> Brown and Caldwell, Inc., 2021 <br /> 4 Everett Water Filtration Plant Resiliency, Reliability, and Redundancy (3R) <br /> Assessment Report, Brown and Caldwell, Inc., 2020 <br /> 5 Everett Water Filtration Plant Unit Process Performance Assessment Technical <br /> Memorandum, Brown and Caldwell, Inc., 2020 <br /> 6 City of Everett Water Filtration Facilities As-Built Plans, Gray and Osborne, Inc., <br /> 1984 <br /> 7 Jackson Hydroelectric Project As-Built Plans, Bechtel, 1984 <br /> 8 City of Everett Water Filtration Facilities Fluoridation System As-Built Plans, Brown <br /> and Caldwell, Inc., 1993 <br /> 9 City of Everett Water Filtration Facilities Phase 1 Plant Expansion As-Built Plans, <br /> Brown and Caldwell, Inc., 1995, Revised 2002 <br /> 10 City of Everett Water Filtration Facilities Facility Improvements Project As-Built <br /> Plans, Brown and Caldwell, Inc., 2006 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.