My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington i Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> 1. Phase 2 Proposal and revisions <br /> NOTE: PROPOSERS SHALL BASE THEIR NOT-TO-EXCEED PRICE ON THE PRECEDING <br /> SCOPE FOR TASK 6 AS WELL AS THE FOLLOWING ASSUMPTIONS: <br /> 2. Effort for preparing for Phase 2 Proposal meeting(s) is to be included in Task 6. <br /> Effort for conducting/attending Phase 2 Proposal meeting(s) is to be included in Task <br /> 1. <br /> Task 8 -Additional Phase 1 Services ['Allowance' <br /> The City may request that the Design-Builder perform potential additional Phase 1 services, for <br /> which the Design-Builder shall be compensated on a negotiated basis. Additional Phase 1 <br /> services may include but are not limited to the following: <br /> • Additional field investigations and environmental evaluations <br /> • Other unanticipated work identified by the City. <br /> Deliverables: <br /> • To be subsequently determined (effort to be excluded from Proposal submission for <br /> Phase 1 Not-to-Exceed Pricing) <br /> Page 19 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.