Laserfiche WebLink
City of Everett,Washington Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> e. Descriptive summary of all engineering, procurement, materials, construction <br /> labor and equipment, and other services necessary to perform the Phase 2 <br /> Work as required under this PDB Contract. <br /> f. A Phase 2 scope of work for engineering services during construction, <br /> describing the work tasks and activities to be provided by the Engineer of <br /> Record and other engineering or geotechnical firms during Phase 2. <br /> g. A Phase 2 staffing plan describing the construction oversight activities to be <br /> completed by the Design-Builder, by the Engineer of Record, by other <br /> engineering or geotechnical firms, and by the City. The intent of this <br /> document is to demonstrate a shared understanding of oversight roles and <br /> responsibilities during construction, and to minimize duplication of efforts. <br /> 3. Pricing submittal, including: <br /> a. The proposed Cost of the Phase 2 Work as defined in the PDB Contract <br /> (including all services required for construction of the Project through Final <br /> Completion) using the City-approved cost model. <br /> b. Supporting documentation for the proposed Cost of the Phase 2 Work at a <br /> minimum shall include: <br /> i. Subcontractor and materials vendor bids and quotations <br /> ii. Details supporting estimates for self-performed construction work (labor, <br /> materials, and equipment) <br /> iii. Expense rates such as mileage charges, per diem for meals and lodging, <br /> and personnel vehicle rentals <br /> iv. Unburdened rental rates on construction equipment, trailers, storage and <br /> staging space and major tools <br /> v. Allowances (where appropriate) <br /> vi. Labor and expense costs for engineering construction support consistent <br /> with the Phase 2 professional services billing rates included in Exhibit E <br /> of the PDB Contract. <br /> c. The proposed Contract Price and breakdown consisting of the proposed Cost <br /> of the Phase 2 Work (including the Design-Builder's contingency), the <br /> Design-Build Fee, the Construction General Conditions Fee, and Pass- <br /> Through Costs (if any). <br /> d. All other proposed Contract Price assumptions and clarifications on terms <br /> and conditions used not covered in the preceding items in this section <br /> e. A list of work activities, expenses and fees not included in the Contract Price <br /> which the City may be expected to pay for <br /> After delivery of the Phase 2 Proposal, the Design-Builder will meet with the City for a technical <br /> meeting to present, review, and answer questions about the content of the Phase 2 Proposal. <br /> The Design-Builder will continue to revise the Phase 2 Proposal as needed and conduct <br /> additional workshops and meetings as needed to obtain City agreement. <br /> Deliverables: <br /> Page 18 of 20 <br />