My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Exhibit D.Work included in Construction General Conditions <br /> — Fuel for support work that does not directly result in the completion of physical Work <br /> associated with the completion of Phase 2. See also Section 7.5.1.8 of the Contract. <br /> — Surveying equipment and supplies <br /> — Project specific signage <br /> • Temporary Amenities and Utilities (includes hookup, metering, and consumption <br /> costs) <br /> — Drinking water (construction team personnel consumption) <br /> — Temporary toilets <br /> — Temporary water distribution (the City will provide all utility water for construction)) <br /> — Temporary fire protection <br /> — Temporary power <br /> — Temporary and emergency lighting <br /> — Temporary construction facilities and services <br /> — Temporary heat and ventilation <br /> — Temporary weather protection <br /> • Site Maintenance and Site Cleanup <br /> — Site security <br /> — Fencing, barricades, partitions, protected walkways, and other measures used for <br /> traffic control on site <br /> — Site erosion control <br /> — Daily site cleanup, dumpsters, and garbage/recyclables disposal <br /> — Cleanup at Substantial Completion <br /> • Health and Safety <br /> — Personal protective equipment (PPE)for staff and visitors <br /> — COVID-19 related PPE (e.g., face masks, face shields, etc.) and all other COVID-19 <br /> related safety implementation measures (e.g., temperature check stations) <br /> — Confined space entry, including personnel protective and monitoring equipment, <br /> standby personnel, and all related costs <br /> — Handwashing stations, hand soap, and handwashing signage <br /> — Alcohol-based hand sanitizer <br /> — First aid <br /> — Fall protection <br /> — Safety program administration and training <br /> — Drug testing <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.