Laserfiche WebLink
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Exhibit D.Work included in Construction General Conditions <br /> — Safety signage <br /> • Project Documentation <br /> — Photographs to document pre-field investigation and pre-construction conditions <br /> — Project progress photos <br /> — Reference manuals <br /> — Project redline drawings <br /> Page 4 of 4 <br />