Laserfiche WebLink
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Request for Proposals I Attachment 1. Required Forms <br /> FORM 7. PHASE 1 ALL-INCLUSIVE BILLING RATES <br /> Form 7 shall be completed by each firm that will provide Phase 1 services. This form <br /> (Phase 1 All-Inclusive Billing Rates) will be incorporated into Exhibit E (Supporting <br /> Pricing Information) of the Design-Build Contract. <br /> IMCO General Construction - Phase 1. All-Inclusive Billing Rates <br /> All-Inclusive <br /> Key Firm Labor Category Billing Rate <br /> IMCO Design Build Manager $155 <br /> IMCO Preconstruction Manager $145 <br /> IMCO Construction Project Manager $115 <br /> IMCO Superintendent $140 <br /> IMCO Estimator $120 <br /> IMCO Scheduler $125 <br /> IMCO BIM Modeler $120 <br /> IMCO GPS/Layout $110 <br /> IMCO Project Engineer $90 <br /> IMCO Project Coordinator $65 <br /> Notes <br /> 1. Phase 1 Services shall be billed at the all-inclusive billing rates and labor categories <br /> identified above, and these rates shall not be subject to increase for any Phase 1 services. <br /> 2. The Phase 1 Services compensation is deemed to include all use, consumer, and other <br /> taxes mandated by applicable Legal Requirements. <br /> 3. The Phase 1 Services compensation rates provided shall not include Washington Sates <br /> Sales tax. <br /> 4. Provide billing rates for all personnel who will provide services during Phase 1, including <br /> Key Personnel and others. The Proposer shall commit to the use of listed billing rates for all <br /> services provided for the duration of Phase 1. <br /> Page 1 of 4 <br />