Laserfiche WebLink
City of Everett,Washington I Water Filter Plant-Phase 2 Capital Upgrades PDB Project <br /> Request for Proposals (Attachment 1. Required Forms <br /> FORM 7. PHASE 1 ALL-INCLUSIVE BILLING RATES <br /> Form 7 shall be completed by each firm that will provide Phase 1 services. This form <br /> (Phase 1 All-Inclusive Billing Rates) will be incorporated into Exhibit E (Supporting <br /> Pricing Information) of the Design-Build Contract. <br /> Kennedy Jenks Phase 1. All-Inclusive Billing Rates <br /> All-Inclusive <br /> Key Firm Labor Category Billing Rate <br /> Kennedy Jenks Design QA/QC $270 <br /> Kennedy Jenks Water Treatment Experts $280 <br /> Kennedy Jenks Design Manager $270 <br /> Kennedy Jenks Process Mechanical $215 <br /> Kennedy Jenks Structural $270 <br /> Kennedy Jenks Civil $175 <br /> Kennedy Jenks Building Mechanical $255 <br /> Kennedy Jenks Electrical/I&C $265 <br /> Kennedy Jenks Architect $260 <br /> Kennedy Jenks CAD Designer $185 <br /> Kennedy Jenks Staff Engineer $190 <br /> Kennedy Jenks Project Administrator $135 <br /> Notes <br /> 1. Phase 1 Services shall be billed at the all-inclusive billing rates and labor categories <br /> identified above, and these rates shall not be subject to increase for any Phase 1 services. <br /> 2. The Phase 1 Services compensation is deemed to include all use, consumer, and other <br /> taxes mandated by applicable Legal Requirements. <br /> 3. The Phase 1 Services compensation rates provided shall not include Washington Sates <br /> Sales tax. <br /> 4. Provide billing rates for all personnel who will provide services during Phase 1, including <br /> Key Personnel and others. The Proposer shall commit to the use of listed billing rates for all <br /> services provided for the duration of Phase 1. <br /> Page 2 of 4 <br />