Laserfiche WebLink
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Request for Proposals 'Attachment 1.Required Forms <br /> FORM 7. PHASE 1 ALL-INCLUSIVE BILLING RATES <br /> Form 7 shall be completed by each firm that will provide Phase 1 services. This form <br /> (Phase 1 All-Inclusive Billing Rates) will be incorporated into Exhibit E (Supporting <br /> Pricing Information) of the Design-Build Contract. <br /> GeoEngineers, Inc. Phase 1. All-Inclusive Billing Rates <br /> AII-Inclusive <br /> Key Firm Labor Category Billing Rate <br /> GeoEngineers, Inc. Staff 1 Scientist $130 <br /> Staff 1 Engineer $135 <br /> Staff 2 Scientist $150 <br /> Staff 2 Engineer $155 <br /> Staff 3 Scientist $170 <br /> Staff 3 Engineer $175 <br /> Scientist 1 $195 <br /> Engineer 1 $200 <br /> Scientist 2 $200 <br /> Engineer 2 $205 <br /> Senior Engineer/Scientist 1 $225 <br /> Senior Engineer/Scientist 2 $250 <br /> Associate $265 <br /> Principal $285 <br /> Senior Principal $315 <br /> Administrator 2 $105 <br /> Administrator 3 $120 <br /> Cad Design Coordinator $155 <br /> GIS Analyst $155 <br /> Senior Technician $120 <br /> Lead Technician $130 <br /> Notes <br /> 1. Phase 1 Services shall be billed at the all-inclusive billing rates and labor categories <br /> identified above, and these rates shall not be subject to increase for any Phase 1 services. <br /> 2. The Phase 1 Services compensation is deemed to include all use, consumer, and other <br /> taxes mandated by applicable Legal Requirements. <br /> 3. The Phase 1 Services compensation rates provided shall not include Washington Sates <br /> Sales tax. <br /> 4. Provide billing rates for all personnel who will provide services during Phase 1, including <br /> Key Personnel and others. The Proposer shall commit to the use of listed billing rates for all <br /> services provided for the duration of Phase 1. <br /> Page 3 of 4 <br />