My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5 <br /> Insurance and Bonds <br /> 5.1 Design-Builder's Insurance Requirements. <br /> 5.1.1 Design-Builder is responsible for procuring and maintaining the insurance for the coverage <br /> amounts all as set forth in the Contract. Coverage shall be secured from insurance companies <br /> authorized to do business in Washington, and with a minimum rating set forth in the Contract. <br /> 5.1.2 Design-Builder's insurance shall specifically delete any design-build or similar exclusions <br /> that could compromise coverages because of the design-build delivery of the Project. <br /> 5.1.3 Prior to commencing any construction services hereunder, Design-Builder shall provide <br /> Owner with certificates evidencing that (i) all insurance obligations required by the Contract <br /> Documents are in full force and in effect and will remain in effect for the duration required by the <br /> Contract Documents and (ii)no insurance coverage will be canceled, renewal refused,or materially <br /> changed unless at least thirty(30)days prior written notice is given to Owner. If any of the foregoing <br /> insurance coverages are required to remain in force after final payment are reasonably available, <br /> an additional certificate evidencing continuation of such coverage shall be submitted with the Final <br /> Application for Payment. If any information concerning reduction of coverage is not furnished by <br /> the insurer, it shall be furnished by the Design-Builder with reasonable promptness according to <br /> the Design-Builder's information and belief. <br /> 5.2 Bonds and Other Performance Security. <br /> 5.2.1 Owner requires Design-Builder to obtain performance and labor and material payment <br /> bonds as set forth in the Contract. <br /> Article 6 <br /> Payment <br /> 6.1 Schedule of Values <br /> 6.1.1 The Design-Builder shall submit a Schedule of Values at least 15 days prior to submitting <br /> their first Application for Payment for Phase 2 Work. The Schedule of Values shall reasonably <br /> allocate the Contract Sum among the various portions of the Work; be complete; be organized to <br /> include detailed breakdown of each major unit of the Work; be organized to correspond to Design- <br /> Builder's schedule; break down the Contract Sum showing the value assigned to each part of the <br /> Work; be so organized as to facilitate assessment of work and payment of Subcontractors; and be <br /> balanced. To the greatest extent possible, the breakdown shall use the same tasks or units as the <br /> Design-Builder's CPM schedule. Design-Builder shall provide documentation substantiating the <br /> cost allocation if asked by the Owner. Upon acceptance of the Schedule of Values by the Owner, <br /> it shall be used as a basis for all requests for payment. <br /> 6.1.2 The Owner will timely review and approve the Schedule of Values so as not to delay the <br /> submission of the Design-Builder's first application for payment. The Owner and Design-Builder <br /> shall timely resolve any differences so as not to delay the Design-Builder's submission of its first <br /> application for payment. <br /> 6.2 Payments. Owner shall make payments for Phase1 and 2 Services in accordance with Section 8 <br /> of the Contract. <br /> GENERAL CONDITIONS OF PROGRESSIVE DESIGN-BUILD CONTRACT,Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.