Laserfiche WebLink
c <br />c <br />entry corridors into the Ciry should be dcsignated as "Gateways" and standards should be applied to <br />devclopments along such "Gateways" relating to building design, landscaping, si�nage, outdoor <br />storage and other aesthetic considcralions that will serve to upgrade Everett's image." To meet the <br />intent of the policy, landscaping in excess of Type III must be provided along Evergreen Way. (Two <br />recent projects that meet the City's gateway policies are the Boeing Credit Union site on Evecgreen <br />Way and Costco on 19th .Avenue SE. j(SEPA Ltuid and Shoreline Use Policies.) <br />The lead agency for this proposal haa detcrmined that it does not have a probable significant adverse impact <br />on the environmenl. An Envimtunentai Impact Statement is not required under RCW 43.21 C.0302(23)(c). <br />'Chis determinatior, assumes compliance w�th Stala law and City ordinances related to general environmental <br />protection including but not limited to right-of-way improvement requirements, drainage, etc. This decision <br />wus made �fler review of a completed environmental checklist and otlier information on file with the lead <br />agency. Tliis informntion is uvailable to the pubiic on request. This Mitigated Determinntion of Non- <br />Significance is specifically conditioned on compliance with the conditions attached hereto which are <br />incorporated by reference as iP fully se! forth herein. <br />This Pinal MDNS is issued under WAC 197-11-355. A 14-day public comment period 1'or this proposal hns <br />been completed. <br />Rcsponsiblc <br />Offieini: Allan Giffen, Director <br />Titic: Plnnning and Community llevelopment <br />Address: 2930 Wetmore Avenue, Suite 8-f\, Everett, WA 982U1 <br />D:�tc: Me,y 21, 2008 <br />5ign:iturc: ' � �-V � <br />You may tippeal tl�is detenninution b filing an appcal on forms provided by the Planning Depnrtment and u <br />fee to the Plmming nnd Communiry Devclopment Permit Services Counter at 3200 Cedar SVeet, 2nd Floor, <br />no I1ter than 14 days fi•om the dnte above. <br />Contact llavid "1)�fer to reaJ or ask about lhe procedures for SEPA appeals. <br />Notes: <br />I. A MDNS may be withdrawn in the event of signific�nt changes in the pruposal, disclosurc of ncw <br />significant informution, misrepresentation by thc npplic�nt, or failure to comply with the conditions <br />upon which this Mitig�ted Determination of Non-Significance is predicated. <br />Z. "Chis 11nd use permit shall terminate if the applicant does not ugply fo�� a building permit within 18 <br />months (or, wiQi an extension, 24 months), except where a time limit on the land use permit is <br />otlicrwise cstnblislied wider federal or state law, ciry ordinance, or an executed development <br />�greement. <br />