My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2818 HOYT AVE FRATERNAL ORDER OF EAGLES 2022-05-23
>
Address Records
>
HOYT AVE
>
2818
>
FRATERNAL ORDER OF EAGLES
>
2818 HOYT AVE FRATERNAL ORDER OF EAGLES 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:47:04 PM
Creation date
5/23/2022 2:46:08 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2818
Tenant Name
FRATERNAL ORDER OF EAGLES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 41/ <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Wednesday, November 17, 2021 12:20 PM <br /> To: Ken Keck— Lynden Sheet Metal; 'harkinsconstruction9@gmail.com' <br /> Subject: City of Everett Permit Services:2818 Hoyt Avenue (B2103-046 & M2107-048) <br /> Attachments: M2107-048_R2.pdf <br /> Hello,gentlemen. <br /> This is a follow-up email to briefly summarize the status of the mechanical permit,and the issues that need to be <br /> addressed on both the mechanical and building permits. The current review letter is attached again for your <br /> convenience. <br /> The mechanical permit was submitted with structural drawings. The structural modifications need to be included in a <br /> building permit; note that the recently resubmitted structural and mechanical drawings received on 10/21/2021 do not <br /> contain updates and therefore do not address the comments in the attached letter. This should be submitted as a <br /> revision to the original building permit;this will not impact continuing work already approved except where the changes <br /> are occurring. The mechanical review also identified architectural issues that similarly need to be addressed in the <br /> revisions to the building permit. <br /> We need to have the comments in the attached letter addressed by the appropriate parties, and revised documents for <br /> both permits submitted for review. Submit documents separately, not together. Submit only mechanical drawings for <br /> the mechanical permit, and only building drawings for the building permit; extra "for reference" copies are not required <br /> for each respective permit. A response letter should be provided for each permit resubmittal. Where a comment is <br /> being addressed on the other permit, it is sufficient to state this as the response for that comment, as long as: <br /> a. Both letters provide a response for each comment; and— <br /> b. A clear action response is indicated on at least one letter for each comment. <br /> c. Mechanical issues are addressed in the mechanical drawings, and building issues are addressed in the <br /> building drawings. <br /> Please coordinate the drawings for each permit before resubmitting either to verify: 1)that all comments have been <br /> addressed; and 2)that there are no conflicts or omissions between the two permit drawings. I will review the revised <br /> drawings for both permits simultaneously. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> isAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:O0pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.