Laserfiche WebLink
" - . - e BRADLEY ENGINEERING, INC. <br /> 811 Yew St. <br /> Bellingham, WA 98229 <br /> Ph. 360-752-5795 <br /> November 21St, 2021 <br /> City of Everett D Permit Services <br /> EVERETT <br /> 2930 Westmore Avenue DEC 09[ ©[ IIf[ <br /> Everett, WA 98201 CITY OF <br /> rmit Services <br /> Re: Eagles Club M2107-048 Permit Second Review Response <br /> 2818 Hoyt Avenue <br /> Dear Mr. Martin, <br /> Please see the attached response in red to the mechanical permit for the Eagles Club at 2818 <br /> Hoyt Avenue. <br /> ic. The response states that the zero-clearance insulation is not required due to the steel stud wall <br /> construction per the Hood Plan on Sheet M1. Please note the following <br /> a. It appears that this wall is new construction, which requires a building permit application. The <br /> building permit must be submitted and approved prior to issuing the mechanical permit. <br /> The updated drawings now show the stainless steel fire wall is to be built per building permit <br /> application B2103-046 which will be submitted by others. <br /> b. The excerpted NFPA language provided in the response letter does not appear consistent with <br /> Section 4.2.3 in the current edition of NFPA 96. In addition, the cited method specifically <br /> relates to"limited combustible materials"which is defined in Section 3.3. The omission of the <br /> zero-clearance insulation in the hood is only permitted if the appropriate wall construction is <br /> provided for a minimum of 18 inches. Otherwise, insulation or a minimum 18-inch clearance <br /> is required as stated in the original comment. <br /> There will be a stainless steel fire wall built, per building permit B2103-046, that will extend a <br /> minimum 18" in all directions of the proposed vent hood. <br /> Architectural <br /> 5. The revised design includes construction of an independent gravity load framing. A separate <br /> building permit application is required for the structural work. The building permit must be <br /> submitted and approved prior to issuing the mechanical permit. <br /> All architectural/structural items to be addressed in submittal documents in building permit <br /> application B2103-046. <br /> 6. The following comments should be addressed for the new beams supporting the mechanical units: <br /> a. The new beam framing is intended to support only the mechanical units per Detail A/S2. <br /> However, the beams and walls do not appear to be provided with structural gaps to prevent <br /> loading of the beams by the roof due to deflections (e.g., snow load, etc.). The new framing <br /> should be vertically independent, including at the roof sheathing. <br /> All architectural/structural items to be addressed in submittal documents in building permit <br /> application B2103-046. <br /> I 2_ <br />