Laserfiche WebLink
S • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Tuesday, December 21, 2021 3:13 PM <br /> To: Ken Keck—Lynden Sheet Metal; harkinsconstruction9 <br /> Subject: City of Everett Permit Services: 2818 Hoyt Avenue (M2107-048) <br /> Hello, Patrick and Ken. <br /> This email follows-up on recent discussions on this project, including a site visit today(12/21/2021)with Patrick and the <br /> owner(and structural engineer via teleconference),and briefly summarizes the status of the review and required <br /> actions by the applicants. The review is on-hold pending resubmittal of revised drawings and supporting documentation <br /> addressing the outstanding review comments. <br /> The review comments issued via email on 08/27/2021 have not been addressed. The City of Everett has discussed the <br /> outstanding comments with various parties to provide clear direction on resolving each issue. This includes in part <br /> submitting the required building modifications(i.e., structural and architectural drawings, and supporting <br /> documentation) as a revision to the Building Permit No. B2103-046. The revised mechanical drawings should be <br /> submitted separately,with revisions as needed, on the mechanical permit. <br /> Comment 7 should be addressed on both permits as follows: 1)Schematically show requirement for maintenance <br /> platform in roof plan of mechanical drawings, and reference building drawings (including"B2103-046)for additional <br /> information; 2) Show specific requirements and/or construction of platform in the supplemental building drawings. The <br /> exception to this is if either the platform is not required due to a sufficiently flat slope (must be verified or stated in the <br /> mechanical drawings),or the platform is integral with the MAU construction and therefore performance requirements <br /> need to be listed. If the latter occurs, additional design criteria must be provided to the structural engineer(e.g., revised <br /> MAU weights,eccentric loads due to cantilevering platform, etc.) Alternatively,the design for the platform should be <br /> included in the building drawings as bearing on the roof structure(should be independent from the new mechanical unit <br /> supporting framing) and be designed per one of the following:A) engineered solution, complete with structural details, <br /> architectural access and guard construction, etc.;or B) deferred submittal, requiring general details providing <br /> performance requirements(e.g, loads, stair and guards requirements,etc.). For either design solution,the building <br /> drawings must include supplemental framing to support the platform off the existing roof(e.g., blocking under the roof <br /> sheathing, etc.). <br /> Please forward a copy of these email to the structural engineer and architect so that all parties are privy to the <br /> correspondence. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> LIAssociate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm &1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />