Laserfiche WebLink
Mr.Drew Martin • S <br /> City of Everett Planning and Public Works <br /> March 12,2019 <br /> File No.262018.055 <br /> Page 5 <br /> a. Calculations substantiating the design of the connection shall be submitted for <br /> review. See IBC Section 1604.1. <br /> b. Specify shoring requirements as needed for the beam. Shoring requirements <br /> shall be similar to those stated in Comment 8 above. Where shoring is not <br /> provided, calculations shall substantiate the remaining connections are adequate <br /> for the temporary condition. <br /> Response: Detail 13/S.10 is 20/S.10 on the revised sheets. See the enclosed structural <br /> calculations. Note that the intent of this connection is to supplement the existing, <br /> deteriorated connection, rather than to replace it. Please see the Comment#3 <br /> response regarding shoring at this location. <br /> If you have any questions or need additional clarification,please contact us. <br /> Sincerely, <br /> Reid Middleton, Inc. <br /> Vot.A,S <br /> Paul N. Crocker, P.E., S.E. <br /> Principal Engineer <br /> O:\18\055 COE Everpark Structural Repair\Received\Permit Review Comments\Response Letter_Struct.docx\sss <br /> 5 5 Reid iddleton <br />