My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
>
Address Records
>
HOYT AVE
>
2823
>
EVERPARK GATEWAY GARAGE
>
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:56:08 PM
Creation date
5/23/2022 2:55:40 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2823
Tenant Name
EVERPARK GATEWAY GARAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr.Drew Martin <br /> City of Everett Planning and Public Works <br /> March 12,2019 <br /> File No.262018.055 <br /> Page 4 <br /> c. The shoring system shall be included in the Special Inspection Schedule on <br /> Sheet SO.0 per IBC Section 1705.1.1. <br /> d. The drawings shall specify temporary construction conditions as needed (e.g., <br /> no vehicle load on the parking deck during repairs, etc.). See IBC Section <br /> 107.2.1 <br /> Response: The delaminated concrete in Note 1 of the detail is believed to be <br /> superficial. The note has been revised to indicate a 1.25" maximum depth of <br /> removal. Shoring does not appear to be required for this work. At other <br /> locations where shoring may be required,temporary shoring for the existing <br /> structure during repair work will be contractor's means and method. See <br /> response to Comment#3. <br /> 9. Detail 16/S.10 (Revised Detail 17/S.10) specifies replacement of the vertical <br /> support connection for precast panels. The following comments shall be <br /> addressed: <br /> a. Calculations substantiating the design of the connection shall be submitted for <br /> review. See IBC Section 1604.1. <br /> Response: Detail 16/S.10 is 17/S.10 on re-submitted drawings. See enclosed <br /> structural calculations. Also, note that these connections are intended to be <br /> supplemental, rather than replacements. Note 4 has been added to clarify that <br /> the supplemental connection is to be completed prior to cleaning the existing <br /> connection. This will eliminate the risk of impairing the support capacity, <br /> should the contractor inadvertently damage the connection during the <br /> cleaning process. <br /> b. Specify shoring requirements as needed for the panel. Shoring requirements <br /> shall be similar to those stated in Comment 8 above. Where shoring is not <br /> provided, calculations shall substantiate the remaining connections are adequate <br /> for the temporary condition. <br /> Response: Precast concrete panels are supported by both the existing <br /> connections and the concrete floor. As noted in the response above,the <br /> supplemental connection should be completed prior to repairing the existing <br /> connection. Therefore,the requirement for a shoring system is not anticipated <br /> during the connection repairs. <br /> 10. Detail 13/S.10 specifies replacement of the support connection for precast beam. <br /> The following comments shall be addressed: <br /> 1-1 5 Reid iddleton <br />
The URL can be used to link to this page
Your browser does not support the video tag.