My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
>
Address Records
>
HOYT AVE
>
2823
>
EVERPARK GATEWAY GARAGE
>
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:56:08 PM
Creation date
5/23/2022 2:55:40 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2823
Tenant Name
EVERPARK GATEWAY GARAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr. Ruben Sanchez <br /> City of Everett <br /> Plan Check Number: B1812-022, Second Building Review <br /> March 19, 2019 <br /> Gravity System: <br /> 5. This comment has not been completely addressed. See IEBC Section 106.2.1. The <br /> following comments shall be addressed: <br /> a. Detail 14/S.10 includes a section cut referencing this detail. Verify the correct reference <br /> should be Section 15/S.10. <br /> b. Note 4 in Detail 17/S.10 specifies locating the existing reinforcement prior to drilling. <br /> Verify if Detail 14/S.10 and other details on this sheet should include this requirement. <br /> 6. No additional comment. <br /> 7. This comment has not been completely addressed. Verify if an end dimension should be <br /> provided. See IEBC Section 106.2.1. <br /> 8. No additional comment. <br /> 9. This comment has not been completely addressed. The following comments shall be <br /> addressed: <br /> a. Calculations have been submitted for the supplemental connection. The load appears to <br /> be applied incorrectly (i.e., downwards instead of upwards toward the top edge). The <br /> direction of loading shall be verified. Revised calculations substantiating the connection <br /> shall be submitted as needed. Note that the"concrete edge failure" mechanism appears <br /> to be 100% utilized (i.e., DCR=1.0) for the current direction of loading. Loading in the <br /> opposite direction is anticipated to yield a DCR>1.0. <br /> b. No additional comment. <br /> 10.This comment has not been completely addressed. Detail 13/S.10 specifies replacement of <br /> the support connection for precast beam. See IBC Sections 1604.1 and 1604.4. The <br /> following comments shall be addressed: <br /> a. Calculations substantiating the design of the connection shall be submitted for review. <br /> The calculation package does not appear to include the design of this connection as <br /> indicated by the response. <br /> b. The proposed FRP confinement includes inward angles that do not appear effective at <br /> remaining in tension. Verify if the FRP should be wrapped around the column, or at <br /> least the sides, and the corners filled (e.g., non-shrink grout, etc.) to maintain tension in <br /> the FRP and provide the required confinement to resist breakout failure of the proposed <br /> connection. <br /> O 3200 Cedar Street 425.257.8800 0 everettpw@everettwa.gov <br /> Everett,WA 98201 425.257.8882 fax everettwa.gov <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.