My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1219 MAPLE ST 2022-05-24
>
Address Records
>
MAPLE ST
>
1219
>
1219 MAPLE ST 2022-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 9:35:00 AM
Creation date
5/24/2022 9:34:49 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
1219
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/15/2022 City of Everett Page 1 J 3 <br /> 6:40 50AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2111-037 Site Address 1219 MAPLE ST <br /> Applied 11/4/2021 Applicant ENERGY FLOW ELECTRIC INC Lot <br /> Approved 11/5/2021 Owner OLUWOLE OLUSEYI Block <br /> Issued 11/9/2021 Contractor ENERGY FLOW ELECTRIC INC Tract <br /> Parent Permit No. M2109-074 Description update panel--Wire up 15 amp Mini split heat pump <br /> Notes -Replace garage overhead risers on both sides. <br /> replace 200A panel <br /> 1/12/22:SCOPE ADDED"-add(2)additional motion lights on the house." <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 11/10/2021 11/10/2021 ELEC 05-SERVICE SKB VIOLATION eTRAKiT Inspection 11/9/2021 1:46 PM ENERGY FLOW <br /> Request ELECTRIC INC <br /> at the back door find lock box# 4016 <br /> Contact Name:DMITRIY MARCHUK <br /> Site Address:1219 Maple St <br /> Phone:4257374221 <br /> e-Mail:energyflowelectric@gmail.com <br /> (11/10/2021 10:37 AM SKB) <br /> Obtain All required work permits especially <br /> plumbing. <br /> Add to scope of work if it includes the mini <br /> split heat pump and new receptacles etc.or <br /> have intity who did it get a work permit for <br /> it. <br /> All grounding electrode conductors must <br /> land on the grounded buss.Bonding of the <br /> service nipple must be done in service <br /> panel.Properly secure the mast.Use a <br /> proper mast for the feeder wire going to <br /> garage.Provide access to make safety check <br /> of garage.Connect to the water electrode. <br /> 12/7/2021 12/7/2021 ELEC 05-SERVICE TJJO CORRECTION eTRAKiT Inspection 12/6/2021 2:50 PM ENERGY FLOW <br /> Request ELECTRIC INC <br /> lock box in the back 4016 <br /> Contact Name:ENERGY FLOW <br /> ELECTRIC INC <br /> Site Address: 1219 MAPLE ST <br /> Phone:4257374221 <br /> e-Mail:energyflowelectric@gmail.com <br /> (12/7/2021 3:20 PM TJJO) <br /> -Seal penetrations(nipples)going from <br /> outside to inside with listed product <br /> -label front of panel <br /> -cover unused upenings in garage panel <br /> -new wiring in garage requires gfci <br /> protection on circuits <br /> -individual green conductors on 40 amp <br /> circuit needs to be removed <br /> -grounded conductor and grounding <br /> electrodes need to be tied together in garage <br /> panel since no ground was ran overhead <br /> INSP12 <br /> SY51MS <br />
The URL can be used to link to this page
Your browser does not support the video tag.