Laserfiche WebLink
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: Everett Transit Operations Base Inductive Charging Infrastructure Project <br />Council Bill # interoffice use <br />Agenda dates requested: <br />May 25, 2022 <br />Briefing <br />Proposed action <br />Consent X <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Project manual <br />Department(s) involved: <br />Transit <br />Legal <br />Contact person: <br />Tom Hingson <br />Phone number: <br />425-257-8939 <br />Email: <br />thingson@everettwa.gov <br />Initialed by: <br />TER <br />Department head <br />Administration <br />Council President <br />Project: Inductive Charging Infrastructure for Everett Transit <br />Partner/Supplier: Brink Electric, Inc. <br />Location: 3225 Cedar Street <br />Preceding action: Call for Bids 2/23/2022 <br />Fund: 425 Transportation Services <br />Fiscal summary statement: <br />Brink Electric, Inc. was the lowest responsive and responsible bidder to the Call for Bids Everett <br />Transit Operations Base Inductive Charging Infrastructure Project approved by City Council on <br />February 23, 2022. <br />Project summary statement: <br />Everett Transit purchased an additional six 100% electric buses and needs to expand the bus <br />charging system(s) on its property at 3225 Cedar Street. On February 23, 2022, Council approved <br />a Call for Bids for the project. <br />Plans and specifications were prepared by Elcon Associates, Inc. to the satisfaction of Everett <br />Transit. The plans and specifications included all costs associated for the construction of the <br />inductive charging system. <br />The scope of work for the Operations Base Inductive Charging Infrastructure includes concrete <br />saw cutting, trenching, electric cabinets, conduits, and inductive charging ground assemblies. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign the contract with Brink Electric, Inc. for the Everett Transit <br />Operations Base Inductive Charging Infrastructure Project. <br />