Laserfiche WebLink
• Topographic mapping will consist of all above ground planimetric features, paving limits, curbs, <br />walks, fences, trees (greater than 6" BDH in right-of-way), etc., and all above and underground <br />utilities, as specified. <br />• Prepare an existing conditions survey base map, showing a 1-foot contour topographic survey at a <br />1"=20'scale. <br />• Prepare an existing conditions DTM based on the topographic survey data. <br />• Surveyor will engage a locate service to assist with underground private/public utility location. <br />• All field data will be processed in accordance with City of Everett survey and CADD standards and <br />sent in AutoCAD format. <br />City of Everett's Responsibilities <br />• City will provide existing survey base maps and as -built information for the storm drain, sanitary <br />sewer, and water systems in the project area, if available. <br />• Permission to enter property parcels (if any) will be secured by the City. <br />Assumptions: <br />• The limits of the topographic survey shall be within the City Right of Way. <br />• Only one site topographic survey will only be required based on the selected preliminary design <br />layout. <br />• This scope does not include the resolution of physical encroachments and occupation that may be <br />disclosed during the course of the field survey. <br />• Easement description/exhibits are not included. <br />Deliverables: <br />• Survey base map and DTM (in AutoCAD Civi13D format) <br />• Stamped survey sheets for inclusion in plan set (PDF) <br />Task 3.2 Geotechnical Services <br />The Consultant will coordinate and provide geotechnical investigations for the pr4ject, as needed, to <br />document subsurface conditions. Geotechnical review and investigation will be provided by a <br />subconsultant. After the completion of the site investigation, the geotechnical engineer will prepare a <br />geotechnical report summarizing site soil conditions and estimated ground water elevations, if <br />encountered, and presenting geotechnical recommendations for construction of the proposed <br />improvements. <br />Assumptions: <br />• Geotechnical investigations will be limited to one exploration boring at the preferred fac <br />location. <br />• No infiltration tests will be required. <br />• Traffic control will be provided by the geotechnical engineer. <br />Deliverables: <br />• Traffic control plan (PDF). <br />• Geotechnical Report, Draft and Final (PDF). <br />1Y <br />City of Everett <br />3`d Ave SE Water Quality Treatment <br />Page 4 of 10 <br />