Laserfiche WebLink
RFQ No. 2021-134 <br />Everett Transit Inductive Charging Infrastructure Field Installation <br />Deliverables: <br />Exhibit A — Scope of Services <br />• Construction bid documents <br />• Construction and installation scope of work <br />• Drawings, schematics, etc. necessary for construction <br />TASK 3- CONSTRUCTION MANAGEMENT: <br />• Participate in construction contractor selection process: <br />• Attend up to six (6) meetings as requested and required as part of process. <br />• Six (6) onsite visits during construction management. <br />• Change order management <br />• Project closeout and document transfer <br />