My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4730 COLBY AVE 2018 YMCA Plans 2022-12-02 (5)
>
Address Records
>
COLBY AVE
>
4730
>
YMCA
>
Plans
>
4730 COLBY AVE 2018 YMCA Plans 2022-12-02 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2022 8:03:22 AM
Creation date
6/16/2022 8:17:31 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4730
Tenant Name
YMCA
Permit
B1809-024
Year
2018
Notes
INITIAL BUILDOUT OF TI SPACE IN NEW YMCA
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Plumb�No�tes <br />1. All piping and plumbing per 2015 UPC. <br />2. Field verify all plumbing material/equipment locations and dimensions before proceeding with any work and report all discrepancies to the general <br />contractor. <br />3. These plans are schematic and do not indicate every offset required for routing. It shall be the P.C.'s responsibility to coordinate pipe routing and <br />elevations with other affected trades before construction. Where conflicts occur, rerouting may be necessary. <br />4. Coordinate plumbing installation with HVAC Mechanical, Fire Protection, and the Electrical Contractor. <br />5. Plumbing contractor to coordinate line voltage power connections with the E.G. for equipment within the plumbing contractors scope. <br />6. Field coordinate footing and floor sleeves where necessary <br />7. All pipe sizing noted on the drawings are minimum. <br />8. Provide cleanouts on sanitary sewer system as required by 2015 UPC. <br />9. All fire stopping of through and membrane penetration as required by the UPC shall be provided and installed by the P.C. <br />10. Slope Waste piping at 2% per foot minimum. Slope 4" waste piping at 1% per foot minimum <br />11. Pipe insulation to be provided on all hot water piping per the WSEC, as indicated in the Pipe Insulation Schedule below. Cold water piping <br />insulation to be minimum of 1/2" for condensation control. Traps and fixture piping below ADA lavatories shall be isolated with 1" insulation and <br />shields. <br />12. Hangers and supports shall be per MSS SP-69. Provide rigid insulation and shields at hanger locations. <br />13, G.C. to provide and install access panels where necessary for access to isolation valves, cleanouts and electronic fixture controllers. P.C. to <br />coordinate locations with G.C. <br />14. P.C. to provide accessible shutoffs for all domestic hot and cold water lines serving fixtures. <br />15. Provide and size vents per UPC. Combine vents and coordinate roof penetrations with G.C. prior to installation. All roof penetrations require <br />flashing. <br />16. All floor drains require trap primers unless otherwise noted. Size and install per industry Standards. <br />17. P.C. shall provide markup of deviations from contract dwgs for incorporation in as -built set on full size drawings. <br />18. P.C. shall provide full plumbing submittal package to Sunset Air for approval prior to purchase and installation. <br />19. Label all Piping and Direction of Flow. <br />20. P.C. shall install underground waste, water and drains to a point 5-feet past the building foundation. Connection to site underground utilities shall <br />be by others. <br />21. PIPING MATERIAL SCHEDULE: <br />22. <br />PIPING <br />LOCATION <br />MATERIAL <br />T JOINT <br />COLD WATER: <br />ALL <br />BELOW 2" - PEX / 2" AND ABOVE COPPER <br />NO -LEAD SOLDER <br />HOT WATER: <br />ALL <br />BELOW 2" - PEX / 2" AND ABOVE COPPER <br />NO -LEAD SOLDER <br />RAIN LEADERS: <br />ALL <br />PVC (CAST IRON IF IN PLENUM) E <br />OLVENT WELD CEMENT (HUBLES, <br />WASTE: <br />ABOVE GROUND <br />PVC (CAST IRON IF IN PLENUM) <br />OLVENT WELD CEMENT (HUBLES, <br />WASTE: <br />BELOW GROUND <br />PVC <br />SOLVENT WELD CEMENT <br />INDIRECT WASTE: <br />ALL <br />PVC <br />SOLVENT WELD CEMENT <br />VENT: <br />ALL <br />PVC <br />SOLVENT WELD CEMENT <br />GAS: <br />ALL <br />SCHEDULE 40 BLACK IRON <br />THREADED < 2-1/2" <br />PIPING INSULATION SCHEDULE:_ <br />PIPING <br />F TYPE <br />PIPE <br />SIZE <br />INSULATION <br />TYPE <br />MATERIAL <br />INSULATION <br />THICKNESS <br />UNDERSIDE OFROOFDRAINS: <br />OVERHEAD RAIN LEADERS: <br />ALL <br />ALL <br />FIBERGLASS <br />FIBERGLASS <br />ALL <br />ALL <br />112" <br />1/2" <br />VERTICAL RAIN LEADERS: <br />ALL <br />NOT REQUIRED <br />ALL <br />OVERHEAD COLD WATER: <br />ALL <br />FIBERGLASS <br />ALL (EXCEPT PEX)_ <br />1/2" <br />HOT WATER <br />1/2" - 1-112" <br />FIBERGLASS <br />ALL <br />ill <br />1-1/2"-4" <br />FIBERGLASS <br />ALL <br />1-1/2" <br />SYMBOL <br />DESCRIPTION <br />MANUFACTURER & MODEL NUMBERS <br />—FIN <br />TOILET: PROFLO: 1731WH <br />W <br />V <br />IN <br />r <br />CVV <br />IN <br />HW IN <br />GAS <br />IN <br />ELEC. <br />REMARKS <br />WATER CLOSET ADA <br />WC-1A <br />WALL MOUNT <br />SEAT: PROFLO: TSCOF2000WH <br />4" <br />2" <br />1/2" <br />ADA, VERIFY TOILET BOWL HANDLE SIDE BEFORE ORDERING <br />AUTO FV <br />FLUSH VALVE: SLOAN: 8111 <br />— <br />--- <br />-1/2-- <br />L-1 <br />LAV WALL -HUNG <br />SINGLE HANDLE <br />SINK: <br />tFAUCET: <br />_ECOS <br />PROFLO: 5414WH <br />SLOAN SF-2350-BDM 0.5 GPM <br />1 1/2" <br />1 1/2" <br />1/2" <br />" <br />S-1 <br />HAND WASH SINK <br />� STAINLESS <br />SINK: <br />FAUCET: <br />PROFLO: PFSR171963 <br />PROFLO: PFXC688OLSCP <br />1 1/2" <br />1 1/2" <br />1/2" <br />1/2" <br />- <br />DF-2 <br />DRINKING FOUNTAIN <br />� DOUBLE ADA A <br />TAIN: <br />FOUNTAIN: <br />ELKAY: LZSTL8WSLP TWO -LEVEL BARRIER FREE <br />2" <br />1 1/2" <br />1/2" <br />- <br />V <br />—L <br />W/ BOTTLE FILLER <br />__1/2"o CW <br />IF-1 <br />1 <br />1/2"o CW <br />A <br />1/2"o HW <br />PLUMBING 2ND FLOOR - DOMESTIC <br />WATER <br />1/8" = 11-01, <br />8 <br />6 7 <br />A <br />Zfl <br />0 K Vid? <br />210-i tit <br />11" <br />PLUMBING 2ND FLOOR - WASTE AND <br />VENT - ABOVE FLOOR <br />1/8" = 1 1-011 <br />iJ <br />31. 0 <br />2' <br />UP TO 2ND FLOOR T.I. 1 <br />CONNECT DOWN TO <br />EXISTING WASTE <br />UP TO 2ND FLOOR T.I. <br />PLUMBING 2ND FLOOR - WASTE AND <br />VENT BELOW FLOOR <br />1/8" 011 <br />0 ywlaw4 <br />Lu <br />0 <br />Q <br />rr. <br />0 <br />ILL <br />Z <br />V) <br />Ln< <br />>: <br />LU <br />Ci <br />no <br />0 <br />ALL DOCUMENTS, ELECTRONIC OR OTHERWISE, <br />PREPARED BY SUNSETAIR ARE FOR USE SOLELY <br />WITH RESPECT TO THE SUBJECT PROJECT. SUNSET <br />AIR IS THE OWNER OF THE DOCUMENTS, AND SHALL <br />RETAIN ALL COMMON LAW, STATUTORY, AND OTHER <br />RESERVE RIGHTS, INCLUDING COPYRIGHTS. <br />EXPRESSLY CONDITIONED UPON SUNSET AIR <br />PERFORMING THE CONSTRUCTION ASSOCIATED <br />WITH THE DOCUMENTS FOR THE PROJECT, SUNSET <br />AIR GRANTS TO CLIENT A NON-EXCLUSIVE LICENSE <br />TO REPRODUCE SUNSETAIRS DOCUMENTS SOLELY <br />FOR PURPOSES OF CONSTRUCTING, USING, AND <br />MAINTAINING THE PROJECT, PROVIDED THAT CLIENT <br />SHALL COMPLY W ITH ALL OBLIGATIONS, INCLUDING <br />EXPIRES: 08-11-16 <br />LM <br />Uj <br />Lu <br /><< <br />>- <br />03 <br />0 1— <br />(j LJj <br />UjC:) <br />ry C-) <br />Lu(�D <br />�:> " <br />r,— <br />C 00 <br />Jr- LU o-) <br />DESIGNEDBY: <br />RMC <br />DRAWN BY: <br />SFC <br />REVIEWED BY: <br />RJP <br />REVISIONS <br />07.18.18 <br />ISSUE FOR DESIGN <br />DEVELOPMENT <br />09.10.18 <br />90% CD <br />09.20.18 <br />PERMIT SET <br />PLUMBING GENERAL <br />NOTES, SCHEDULES, AND <br />FLOORPLANS <br />-SHEET NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.