My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-07.2.RTF <br /> 2 1-07.2 State Taxes <br /> 3 <br /> 4 Delete this section, including its sub-sections, in its entirety and replace it with the following: <br /> 5 I 6 1-07.2 State Sales Tax <br /> 7 (June 27, 2011 APWA GSP) <br /> 8 <br /> 9 The Washington State Department of Revenue has issued special rules on the State <br /> 10 sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br /> 11 Contractor should contact the Washington State Department of Revenue for answers to <br /> 12 questions in this area. The Contracting Agency will not adjust its payment if the111 <br /> 13 Contractor bases a bid on a misunderstood tax liability. <br /> 14 <br /> 15 The Contractor shall include all Contractor-paid taxes in the unit bid prices or other <br /> 16 contract amounts. In some cases, however, state retail sales tax will not be included. <br /> 17 Section 1-07.2(2) describes this exception. <br /> 18 <br /> 19 The Contracting Agency will pay the retained percentage (or release the Contract Bond if <br /> 20 a FHWA-funded Project) only if the Contractor has obtained from the Washington State <br /> 21 Department of Revenue a certificate showing that all contract-related taxes have been <br /> 22 paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to the <br /> 23 Contractor any amount the Contractor may owe the Washington State Department of <br /> 24 Revenue, whether the amount owed relates to this contract or not. Any amount so I <br /> 25 deducted will be paid into the proper State fund. <br /> 26 <br /> 27 1-07.2(1) State Sales Tax— Rule 171 <br /> 28 <br /> 29 WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets, <br /> 30 roads, etc., which are owned by a municipal corporation, or political subdivision of the <br /> 31 state, or by the United States, and which are used primarily for foot or vehicular traffic. <br /> 32 This includes storm or combined sewer systems within and included as a part of the <br /> 33 street or road drainage system and power lines when such are part of the roadway <br /> 34 lighting system. For work performed in such cases, the Contractor shall include <br /> 35 Washington State Retail Sales Taxes in the various unit bid item prices, or other contract <br /> 36 amounts, including those that the Contractor pays on the purchase of the materials, <br /> 37 equipment, or supplies used or consumed in doing the work. <br /> 38 <br /> 39 1-07.2(2) State Sales Tax — Rule 170 <br /> 40 <br /> 41 WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or <br /> 42 existing buildings, or other structures, upon real property. This includes, but is not <br /> 43 limited to, the construction of streets, roads, highways, etc., owned by the state of <br /> 44 Washington; water mains and their appurtenances; sanitary sewers and sewage I <br /> 45 disposal systems unless such sewers and disposal systems are within, and a part of, a <br /> 46 street or road drainage system; telephone, telegraph, electrical power distribution lines, <br /> 47 or other conduits or lines in or above streets or roads, unless such power lines become a <br /> 48 part of a street or road lighting system; and installing or attaching of any article of <br /> 49 tangible personal property in or to real property, whether or not such personal property <br /> 50 becomes a part of the realty by virtue of installation. <br /> 51 <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 18 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.