My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> I2 3. Permanent pavement marking must comply with Section 8-22. <br /> 3 <br /> I 4 5-04.3(15) Vacant <br /> 5 <br /> 6 5-04.3(16) HMA Road Approaches <br /> 7 HMA approaches shall be constructed at the locations shown in the Plans or where <br /> 8 staked by the Engineer. The Work shall be performed in accordance with Section 5-04. <br /> 9 <br /> I10 5-04.4 Measurement <br /> 11 "Planing Bituminous Pavement (2" Deep)", shall be measured by the square yard. <br /> I 12 <br /> 13 "HMA Class '/2", PG 64-22", shall be measured by the ton. <br /> 14 <br /> I 15 5-04.5 Payment <br /> 16 Payment will be made in accordance with Section 1-04.1, for each of the following bid <br /> 17 items that are included in the proposal: <br /> I 18 <br /> 19 "HMA Class '/2" PG 64-22", per ton. <br /> 20 <br /> 21 The unit contract price per ton for "HMA Class 1/2" PG 64-22", shall be full compensation <br /> I 22 for all costs incurred to carry out the requirements of Section 5-04 except for those costs <br /> 23 included in other items which are included in the sub-section and which are included in <br /> 24 the proposal. <br /> I 25 <br /> 26 HMA for Pre-leveling, if required by the Engineer, will be paid for under bid item, "HMA <br /> 27 Class 1/2" PG 64-22", per ton. <br /> I 28 <br /> 29 All costs for"Asphalt Tack Coat", "Anti Stripping Additive", and "Compaction Adjustment" <br /> 30 shall be included in the unit contract price per ton for"HMA Class '/2" PG 64-22", per ton. <br /> I 31 <br /> 32 "Planing Bituminous Pavement (2" Deep)", per square yard. <br /> 33 <br /> It 34 The Unit contract price for"Planing Bituminus Pavement(2" Deep), per square yard shall <br /> 35 be full payment for all costs incurred to perform the work described in Section 5-04.3(14). <br /> 36 <br /> 37 (January 13, 2021) <br /> I38 Asphalt Cost Price Adjustment <br /> 39 The Contracting Agency will make an Asphalt Cost Price Adjustment, either a credit or a <br /> 40 payment, for qualifying changes in the reference cost of asphalt binder. The adjustment <br /> 111 41 will be applied to partial payments made according to Section 1-09.9 for the following bid <br /> 42 items when they are included in the proposal: <br /> 43 <br /> I 44 "HMA Cl. PG " <br /> 45 "HMA for Approach Cl. PG " <br /> 46 "HMA for Preleveling Cl. PG " <br /> 47 "HMA for Pavement Repair Cl. PG " <br /> 48 "Commercial HMA <br /> I <br /> ii 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 70 OF 85 SPECIALS <br /> II WORK ORDER 3764 ADDENDUM 2 MARCH 11,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.