My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 24. 0 Plastic Bicycle Detector $ $ <br /> Each Symbol Per Each <br /> 25. 1.0 Raised Pavement Markers, $ $ <br /> Hundred Type 2 Per Hund <br /> 26. 0.0O , Centerline Rumble Strip $ $ • <br /> Mile Per Mile <br /> i <br /> 27. 5,510 Temporary Pavement $ $ I <br /> Linear Foot Markus Per L.F. <br /> 28. 0 Removing Cement Conc. $ $ I <br /> Square Yard Sidewalk Per S.Y.,' <br /> 29. 60 Vehicle Loop Detect s $ • $ • 1 <br /> Linear Foot /er L.F. <br /> 30. 0 Loop Lead-In Detector $ I <br /> Linear Foot er L.F. <br /> f <br /> 31. 0 Conduit Pipe,2" Diameter $ '\ $ • <br /> Linear Foot Per L.F.\ <br /> 32. 0 Video Erection System $ $ •• <br /> I <br /> Lump Sum Per L.S. <br /> r <br /> 33. 0 Spill Prevention Control Plan $ • \ $ • <br /> Lump Sum / Per L.S. <br /> \ 1 <br /> 34. 1 Resolve Above Ground $ 5000 . 00 `�$ 5000 . 00 <br /> Estimate Conflicts Per Est. <br /> 35. 1 Erosion/Water Pollution $ 1000 . 00 $ ''�� 1000 . 00 <br /> Estimate Control Per Est. <br /> 36. / 1 Asphalt Cost Price $ 1,618 . 00 $ 118 . 00 <br /> Calculation Adjustment Per Calc. I <br /> BID ADDITIVE ITEMS \ <br /> FOR SCHEDULE E $ I <br /> SUBTOTAL <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 17 OF 29 ADDENDUM 2 - DIVISION P <br /> WORK ORDER 3764 SCHEDULE E MARCH 11, 2022 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.