My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) <br /> (FIGURES) <br /> 24. 0 Plastic Bicycle Detector $ • $ <br /> I Each Symbol Per Each <br /> 25. 0.0 Raised Pavement Markers, $ $ <br /> �iundred Type 2 Per Hund <br /> I 26. 0:00 Centerline Rumble Strip $ $ <br /> Mile\ Per Mile <br /> i <br /> I 27. 0 Temporary Pavement $ • <br /> ./, $ <br /> Linear Foot Markings Per L.F. <br /> 28. 0 Removin Cement Conc. $ • $ <br /> Square Yard Sidewalk Per S.Y. <br /> I29. 0 Vehicle Loop Dete rs $ • $ • <br /> Linear Foot Per L.F. <br /> 1 30. 0 Loop Lead-In Detector Cable $ . <br /> Linear Foot r L.F. <br /> 31. 0 Conduit Pipe,2" Diamet $ • $ • <br /> Linear Foot Per L.F. \ <br /> I32. 0 Video Dete <br /> ction Sy tem $ \ . $ . <br /> Lump Sum Per L.S. <br /> 33. 0 Spill Prevent' n Control Plan $ $ <br /> Lump Sum Per L.S. `� <br /> v, <br /> 34. 1 Resolve'Above Ground $ 5000 . 00 $ \ 5000 . 00 <br /> Estimate ConfliEts Per Est. <br /> 35. 1 Erosion/Water Pollution $ 200 . 00 $ \200 . 00 <br /> IEstimate Control Per Est. <br /> 36. 10,020 Asphalt Cost Price $ 176 . 00 $ 176 . 3,0 <br /> ICalculation Adjustment Per Calc. <br /> BID ADDTIVIE ITEMS <br /> FOR SCHEDULE F $ <br /> SUBTOTAL <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 20 OF 29 ADDENDUM 2 - DIVISION P <br /> WORK ORDER 3764 SCHEDULE F MARCH 11, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.