My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quantities Per Street J <br /> Schedule C <br /> I <br /> Item Number Description Units 23rd St <br /> Walnut St to Broadway U <br /> 3 Uniformed Police Officer Hour 40 <br /> 5 Portable Changeable Message Sign Hour 184 <br /> 6 Planing Bituminous Pavement S.Y. 12,927 <br /> 7 Additional Planing Bituminous Pavement S.Y. 1,939 <br /> 8 HMA Class 1/2 Inch, PG 64-22 Ton 1,584 I <br /> 9 Street Cleaning Hour 26 <br /> 10 Adjust Manhole Each 24 <br /> 11 Adjust Catch Basin/Inlet to Grade Each - I <br /> 12 Adjust Valve Box to Grade Each 11 <br /> Adjust Existing Monument Castings to Grade Each 7 <br /> 13 <br /> 14 Profile Plastic Line L.F. 0 <br /> 15 Profile Plastic Wide Line L.F. 0 <br /> 16 Plastic Wide Line L.F. 0 <br /> 17 Plastic Traffic Arrow Each 0 <br /> 18 24" Plastic Crosswalk Line S.F. 520 <br /> 19 24" Plastic Stop Bar L.F. 31 <br /> 20 Plastic Line L.F. 3178 <br /> 21 Plastic Traffic Letter Each 12 <br /> 22 Plastic Bicycle Lane Symbol Each 0 <br /> 23 Plastic Sharrow Each 0 <br /> 24 Plastic Bicycle Detector Symbol Each 0 I <br /> 25 Raised Pavement Markers,Type 2 Hund 1 <br /> 26 Centerline Rumble Strip Mile 0 <br /> 27 Temporary Pavement Markings L.F. 6432 <br /> 28 Removing Cement Conc. Sidewalk S.Y. 0 <br /> 29 Vehicle Loop Detectors L.F. 0 <br /> 30 Loop Lead-In Detector Cable L.F. 0 <br /> 31 Conduit Pipe, 2" Diameter L.F. 0 I <br /> I <br /> I <br /> I <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY ADDENDUM 2 APPENDIX G <br /> WORK ORDER 3764 PAGE 10 of 13 MARCH 11,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.