Laserfiche WebLink
11 Quantities Per Street <br /> ISchedule C <br /> Item Number Description Units 23rd St <br /> 1 Walnut St East to I-5 <br /> 3 Uniformed Police Officer Hour 50 <br /> 5 Portable Changeable Message Sign Hour 186 <br /> 6 Planing Bituminous Pavement S.Y. 6,656 <br /> 7 Additional Planing Bituminous Pavement S.Y. 998 <br /> I 8 HMA Class 1/2 Inch, PG 64-22 Ton 815 <br /> 9 Street Cleaning Hour 14 <br /> 10 Adjust Manhole Each 13 <br /> I11 Adjust Catch Basin/Inlet to Grade Each - <br /> 12 Adjust Valve Box to Grade Each 1 <br /> I Adjust Existing Monument Castings to Grade Each 1 <br /> 13 <br /> 14 Profile Plastic Line L.F. 0 <br /> I 15 Profile Plastic Wide Line L.F. 0 <br /> 16 Plastic Wide Line L.F. 0 <br /> 17 Plastic Traffic Arrow Each 0 <br /> I <br /> 18 24" Plastic Crosswalk Line S.F. 260 <br /> 19 24" Plastic Stop Bar L.F. 65 <br /> I 20 Plastic Line L.F. 2425 <br /> 21 Plastic Traffic Letter Each 0 <br /> 22 Plastic Bicycle Lane Symbol Each 0 <br /> I 23 Plastic Sharrow Each 0 <br /> 24 Plastic Bicycle Detector Symbol Each 3 <br /> 25 Raised Pavement Markers,Type 2 Hund 0.6 <br /> 1 26 Centerline Rumble Strip Mile 0 <br /> 27 Temporary Pavement Markings L.F. 4533 <br /> 28 Removing Cement Conc. Sidewalk S.Y. 0 <br /> I29 Vehicle Loop Detectors L.F. 80 <br /> 30 Loop Lead-In Detector Cable L.F. 0 <br /> I31 Conduit Pipe, 2" Diameter L.F. 0 <br /> I <br /> I <br /> I <br /> II <br /> 2022 PAVEMENT MAINTENANCE OVERLAY ADDENDUM 2 APPENDIX G <br /> IWORK ORDER 3764 PAGE 9 of 13 MARCH 11,2022 <br />