Laserfiche WebLink
I <br /> IBID PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> I2022 PAVEMENT MAINTENANCE OVERLAY <br /> W.O. 3764 <br /> INote: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between <br /> the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to <br /> Iconform thereto. All entries must be typed or entered in ink. <br /> BIDDER NAME Central Paving, LLC <br /> IBASE BID <br /> THIS SCHEDULE WILL BE CONSTRUCTED WITH APPROVED CONTRACT <br /> ISCHEDULE A - MULTIPLE CITY STREETS <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> INO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 1. 1 Mobilization $ 179,620 . 00 $ 179,620 . 00 <br /> ILump Sum Per L.S. <br /> I 2. 3,078 Flaggers(Minimum Bid $ 77 00 $ 237,006 00 <br /> Hour Prevailing Wage) Per Hour <br /> I 3. 180 Uniformed Police Officer $ 137 • 00 $ 24,660 00 <br /> Hour Per Hour <br /> I 4. 1 Project Temporary Traffic $ 57,800 00 $ 57,800 00 <br /> Lump Sum Control Per L.S. <br /> I5. 1,148 Portable Changeable $ 16 50 $ 18,942 00 <br /> Hour Message Sign Per Hour <br /> I6. 72,191 Planing Bituminous $ 2 . 72 $ 196,359 . 52 <br /> Square Yard Pavement Per S.Y. <br /> I7. 10,829 Additional Planing $ 1 . 00 $ 10,829 . 00 <br /> Square Yard Bituminous Pavement Per S.Y. <br /> I8. 8,845 HMA Class 1/2 Inch, PG 64- $ 99 . 00 $ 875,655 . 00 <br /> Ton 22 Per Ton <br /> I9. 130 Street Cleaning $ 181 . 00 $ 23,530 . 00 <br /> Hour Per Hour <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 3 OF 29 ADDENDUM 1 -DIVISION P <br /> I WORK ORDER 3764 SCHEDULE A MARCH 7, 2022 <br />