Laserfiche WebLink
I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT I <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> 10. 41 Adjust Manhole $ 100 . 00 $ 4,100 . 00 I <br /> Each Per Each <br /> 11. 90 Adjust Catch Basin/Inlet to $ 100 . 00 $ 9,000 . 00 I <br /> Each Grade Per Each <br /> 12. 59 Adjust Valve Box to Grade $ 100 . 00 $ 5,900 . 00 I <br /> Each Per Each <br /> 13. 13 Adjust Existing Monument $ 100 00 $ 1 ,300 00 I <br /> Each Castings to Grade Per Each <br /> 14. 4,738 Profile Plastic Line $ 1 . 65 $ 7,817 . 70 I <br /> Linear Foot Per L.F. <br /> 15. 92 Profile Plastic Wide Line $ 7 . 50 $ 690 . 00 I <br /> Square Yard Per L.F. <br /> 16. 946 2 . 75 2 601 . 50 I <br /> Plastic Wide Line $ $ , <br /> Linear Foot Per L.F. I <br /> 17. 23 Plastic Traffic Arrow $ 165 . 00 $ 3,795 . 00 <br /> Each Per Each II <br /> 18. 1,400 24" Plastic Crosswalk Line $ 7 . 15 $ 10,010 . 00 <br /> Square Foot Per S.F. I <br /> 19. 421 24" Plastic Stop Bar $ 11 . 00 $ 4,631 . 00 <br /> Linear Foot Per L.F. I <br /> 20. 31,746 Plastic Line $ 1 • 30 $ 41 ,269 • 80 I <br /> Linear Foot Per L.F. <br /> 21. 21 Plastic Traffic Letter $ 110 • 00 $ 2,310 • 00 I <br /> Each Per Each <br /> 22. 0 Plastic Bicycle Lane Symbol $ 00 . 00 $ 00 . 00 I <br /> Each Per Each <br /> 23. 31 Plastic Sharrow $ 148 . 00 $ 4,588 . 00 I <br /> Each Per Each <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 4 OF 29 ADDENDUM 1 -DIVISION P I <br /> WORK ORDER 3764 SCHEDULE A MARCH 7, 2022 <br />