Laserfiche WebLink
I <br /> I <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I <br /> 24. 3 Plastic Bicycle Detector $ 121 . 00 $ 363 . 00 <br /> Each Symbol Per Each <br /> 1 25. 6.9 Raised Pavement Markers, $ 550 . 00 $ 3,795 . 00 <br /> Hundred Type 2 Per Hund <br /> 1 26. 0.34 Centerline Rumble Strip $ 12,650 . 00 $ 4,301 . 00 <br /> Mile Per Mile <br /> I27. 57,244 Temporary Pavement $ 00 28 $ 16,028 32 <br /> Linear Foot Markings Per L.F. <br /> I28. 0 Removing Cement Conc. $ 00 00 $ 00 . 00 <br /> I <br /> Square Yard Sidewalk Per S.Y. <br /> 29. 690 Vehicle Loop Detectors $ 21 . 00 $ 14,490 . 00 <br /> ILinear Foot Per L.F. <br /> 30. 0 Loop Lead-In Detector Cable $ 00 . 00 $ 00 . 00 <br /> ILinear Foot Per L.F. <br /> 31. 0 Conduit Pipe,2" Diameter $ 00 . 00 $ 00 . 00 <br /> ILinear Foot Per L.F. <br /> 32. 1 Video Detection System $ 18,900 . 00 $ 18,900 . 00 <br /> I <br /> Lump Sum Per L.S. <br /> 33. 1 Spill Prevention Control Plan $ 500 . 00 $ 500 . 00 <br /> 1 Lump Sum Per L.S. <br /> I <br /> 34. 1 Resolve Above Ground $ 5000 . 00 $ 5000 . 00 <br /> Estimate Conflicts Per Est. <br /> I <br /> 35. 1 Erosion/Water Pollution $ 7000 00 $ 7000 00 <br /> Estimate Control Per Est. <br /> I <br /> 36. 1 Asphalt Cost Price $ 10,020 . 00 $ 10,020 . 00 <br /> Calculation Adjustment Per Calc. <br /> IBASE BID ITEMS <br /> SCHEDULE A $ 1,802,811 . 84 <br /> I <br /> SUBTOTAL <br /> 2022 PAVEMENT MAINTENANCE OVERLAY 5 OF 29 ADDENDUM 2 - DIVISION P <br /> WORK ORDER 3764 SCHEDULE A MARCH 11, 2022 <br />