Laserfiche WebLink
22 _W22"' 23 <br />�25�Ni W2� <br />23 28.5 29 29.5 30 . 30.5 32 31.5 32 32.5 33 33.5 34 �. � 34.5 <br />_--- - -- -4i- — — <br />---TO <br />TEMPORARY FLOATING <br />DEBRIS BOOM, w �` <br />- G; A DNr_ <br />A' <br />c / r <br />EXISTING DOL.II'l <br />BERTH TSTILE, <br />PRO CT 1N PLACE- - <br />Z <br />LEGEND <br />EX DECK PANEL BALLAST DRAIN. <br />PROTECT IN PLACE. C1 m1 C1 m4- <br />cl, «`� STORM DRAIN INLET PROTECTION PER <br />CITY STD DWG 210 <br />�- w <br />ECOLOGY BLOCK <br />TEMPORARY CONSTRUCTION FENCE <br />TEMPORARY SEDIMENT BARRIER <br />go PROJECT SITE/WORK AREA LIMITS <br />ACP SAWCUT LINE <br />i <br />{ GROUND SLOPE DIRECTION <br />I TEMPORARY FLOATING DEBRIS BOOM <br />SECURE TEMP FLOATING <br />DEBRIS BOOM TO SHORE�-- <br />x I ABOVE HIGH TIDE <br />X OIL APPROX 45'Lx45'Wx6'H I.D. <br />ON �rC ea, _ EX CONC ECOLOGY BLOCK - -- -� <br />�_ __ _� CONTAINMENT AREA AVAILABLE, <br />" -FOR USE BY CONTRACTOR TO <br />_ STOCKPILE BALLAST FROM WHARF <br />~� AND/OR NON --CONTAMINATED <br />SITE SOILS. MAX HEIGHT=8' <br />El 0 10 1 APPROX AVAILABLE VOL=400 CY <br />x L I <br />I <br />x_= x -x,ar x- x. <br />ss s <br />ECOLOGY BLOCK CONTAINMENT CELL FOR TEMPORARY STOCKPILE OF <br />WHARF BALLAST, SEE SHEET C104 FOR DETAILS. CONTRACTOR SHALL <br />RETURN BALLAST TO THE WHARF FOLLOWING COMPLETION OF THE <br />WHARF STRUCTURAL IMPROVEMENTS. ANY SURPLUS BALLAST <br />MATERIAL SHALL BE USED AS CRUSHED ROOK BASE FOR UPLAND <br />PAVEMENT REPLACEMENT, <br />ECOLOGY BLOCK CONTAINMENT CELL FOR TEMPORARY STOCKPILE OF <br />POTENTIALLY CONTAMINATED SOILS® SEE SHEET C1 v4 FOR DETAILS. <br />CONTAINMENT CELL SIZE AND LOCATION SMALL BE DETERMINED BY <br />THE CONTRACTOR. <br />ECOLOGY BLOCK CONTAINMENT CELL FOR TEMPORARY STOCKPILE OF <br />GEOTECHNICALLY UNSUITABLE SOILS. SEE SHEET C1.4 FOUR DETAILS. <br />CONTAINMENT CELL SIZE AND LOCATION SHALL BE DETERMINED BY <br />THE CONTRACTOR. <br />ECOLOGY BLOCK CONTAINMENT CELL FOR TEMPORARY STOCKPILE OF <br />GEOTECHNICALLY SUITABLE SOILS. SEE SHEET C1 e1 FOR SCHEMATIC <br />LOCATION AND SKEET C104 FOR DETAILS. CONTAINMENT CELL SIZE <br />AND LOCATION SMALL BE DETERMINED BY THE CONTRACTOR. <br />IT IS THE CONTRACTOR RESPONSIBILITY TO MANAGE AND MAINTAIN <br />ALL STOCKPILE AREAS ASSOCIATED WITH THE WORK IN CONFORMANCE WITH THE PLANS, SPECIFICATIONS AND THE PROJECT <br />SOIL AND GROUNDWATER MANAGEMENT PLAN, <br />