Laserfiche WebLink
m <br />/, o tf ✓, —! /' �°' ACP DEMO EXTENTS FOR 4 <br />ELEC DUCTBANK TRENCHING. ,r <br />STORM DRAIN INLET <br />ors - ! PROTECTION PER CITY <br />STD DWG 210, TYP <br />EX SID LIFT STATIONS � <br />\/,/,PROTECT IN PLACE <br />!,�` 1 I ,/J ; '✓��,ram '`— ``0' <br />APPROX CONTRACTOR WORK AREA FOR <br />,' ELEO DUCT BANK, DELINEATE AREA WITH <br />LU <br />CONES OR TEMP BARRIER. SEE SHEET G3.5 ,9a <br />FOR FURTHER WORK AREA REQUIREMENTS, <br />AO P SAW O UT LINE <br />!� ;,°` SEE SHEET D2.3 <br />I f <br />X %' ` ��`° I 1 i °CDCD <br />PROTECT IN PLACE, <br />LLFOR ACP DEMO EXTENTS <br />DUOTBANK TRENCHING. <br />` t f SEE NOTE 1 <br />` EX TRACK 104 <br />✓/ I EX OWE, PROTECT f�`� �, `M l EX LIGHT VOLE ! 20.E <br />1� IN PLACE-_ 71-.. <br />EX CONC PAD <br />pp <br />�Vo <br />LLJ <br />.r <br />_ 1 <br />IgBLDG C <br />✓. "~ . 'tea -`.",~„-`"---•---„~`~---_ -----_ .. ____v,_-----._ <br />`Z_...o <br />ss <br />a------- 45 <br />---- <br />I <br />z <br />Port <br />1 015th Avenue, Suite 1300 <br />P.O. BOX 538 Seattle Washington 98101 <br />EVERETT WA 98206 Fax12/08/17 NW ISSUED FOR BID AND PERMIT. <br />PROJECT NO, 1600120 NO. DATE BY REVISION NO. DATE BY REVISION <br />- <br />is <br />{ <br />PROJECT ENGINEER: <br />N. WATSON <br />DESIGNED BY: <br />Je BEOKER <br />DRAWN BY: <br />S. MILLET/ <br />SCALE: <br />AS SHOWN <br />DATE: <br />12/08/2017 <br />CHECKED BY: <br />N. WATS O N <br />TESC NOTE <br />1, ONLY SHORT—TERM STOCKPILING FOR REUSE ALLOWED OUTSIDE <br />OF MAIN WORK AREA WITH APPROVAL OF THE ENGINEER. HALL <br />EXCAVATION MATERIAL TO STOCKPILE WITHIN MAIN WORK AREA. <br />KEY PLAN <br />IF SHEET IS LESS THAN 22x34 <br />REDUCE SCALE ACCORDINGLY <br />IMATERIALSTOCKPILE L( SHEET NO. 31 <br />