Laserfiche WebLink
w <br />z <br />cn <br />z <br />0 <br />0 <br />U_ <br />9 <br />z <br />0 <br />V <br />e <br />0— <br />z <br />M <br />W, <br />m <br />z <br />r <br />w <br />w <br />m <br />0 <br />CL <br />ADJACENT CONTAINMENT. <br />CELL FOR MATERIAL OTHER <br />THAN BALLAST NOT SHOWN <br />r, <br />PROVIDE TEMPORARY SEDIMENT BARRIER <br />ALONG PERIMETER OF NON —CONTAMINATED <br />SOIL STOCKPILE AREA. BARRIER MAY <br />CONSIST OF SAND BAGS, STRAW WATTLES, <br />COMPOST SOCKS OR OTHER APPROVED <br />BMPS THAT ARE SUITABLE TO INTERCEPT <br />AND FILTER STORMWATER RUNOFF. <br />C 1018 C 1 o2I C 104 SCALE: NTS <br />PROVIDE TEMPORARY SEDIMENT BARRIER <br />ALONG PERIMETER OF NON —CONTAMINATED <br />SOIL STOCKPILE AREA. BARRIER MAY <br />CONSIST OF SAND BAGS, STRAW WATTLES, <br />COMPOST SOCKS OR OTHER APPROVED <br />BMPS THAT ARE SUITABLE TO INTERCEPT <br />AND FILTER STORMWATER RUNOFF, <br />1 13 6' <br />C1�21C1.4 <br />Seattle, Washington 98101 <br />_ 0, <br />PROJECT NO. 1600120 <br />Ma M ° 'o € ll <br />WEIGH DOWN PLASTIC <br />COVERING ALONG PERIMETER <br />WITH SAND BAGS. <br />UNSUITABLE <br />CONC ECOLOGY BLOCK CONTAINMENT <br />WALL, TYP. CONTRACTOR TO SECURE <br />BLOCKS TOGETHER WITH METAL <br />PLATES AND/OR PROVIDE TEMP <br />BRACING AS NECESSARY TO MAINTAIN <br />t--rA rl11 I-CN,O /\r- `il IPi lit f°1 r' I✓ %A/A I I <br />STOCKPILE <br />I <br />EX CONC <br />DECK PANEL <br />EX ACP, DEPTH VARIES 4" TO 6' <br />EX BALLAST, DEPTH VARIES 12" TO 14" <br />EX REMOVABLE STEEL <br />DECK DRAIN COVER, <br />r r� PROTECT IN PLACE. <br />m <br />(--`1� WHARF�— <br />C1.1, C1.2�t;i.4 SCALE: NTa <br />SCALE: <br />AS SHOWN <br />DATE: <br />12/08/2017 <br />CHECKED BY: <br />N. WATSON <br />NOTES <br />w <br />FILTER FABRIC, INSTALL <br />AT EACH DECK DRAW <br />AND REMOVE PRIOR TO <br />BALLAST REPLACEMENT <br />BRAIN PR0TECT10N <br />OD CONTRACTOR IS RESPONSIBLE FOR SOIL AND STOCKPILE MANAGEMENT, INCLUDING <br />SIZE, LOCATION AND NUMBER OF STOCKPILES. SEE SPECIFICATIONS FOR FURTHER <br />REQUIREMENTS. <br />O RIBS AND TEARS IN THE PLASTIC SHEETING SHALL BE REPAIRED IN A TIMELY MANNER <br />PER THE SPECIFICATIONS. <br />O3 SEE SPECIFICATIONS FOR FURTHER WHARF BALLAST REUSE AND STOCKPILE <br />REQUIREMENTS. <br />4 THE CONTRACTOR SHALL CLEAN OUT STORMWATER CATCH BASINS PRIOR TO INSTALLING <br />INLET PROTECTION AND ALSO AT COMPLETION OF THE PROJECT, <br />INLET PROTECTION SHALL BE MAINTAINED PER MANUFACTURERS RECOMMENDATIONS <br />AND SHALL BE CLEANED OR REMOVED AND REPLACED WHEN SEDIMENT HAS FILLED <br />ONE—THIRD OF THE AVAILABLE STORAGE. ANY ACCUMULATED SEDIMENT ON OR <br />AROUND THE INLET SHALL BE REMOVED IMMEDIATELY AND DISPOSED AT AN APPROVED <br />LOCATION. <br />SEDIMENT SHALL NOT BE REMOVED BY FLUSHING WITH WATER. ALL SEDIMENT MUST <br />BE DISPOSED OF OFF —SITE AT AN APPROVED FACILITY. <br />FIELD LOCATE BALLAST DECK DRAINS AND HAND DIG AT EACH LOCATION TO PROTECT <br />THE DRAINS DURING BALLAST REMOVAL. PROVIDE AND MAINTAIN TEMPORARY FILTER <br />FABRIC DURING CONSTRUCTION. REMOVE FILTER FABRIC AND ENSURE THAT DECK <br />DRAIN IS PROPERLY INSTALLED PRIOR TO BACKFILL OF BALLAST MATERIAL. <br />VERT DATUM: MLLW = DoD' <br />HORZ DATUM: NAD 83/91 <br />IF SHEET IS LESS THAN 22x34 <br />REDUCE SCALE ACCORDINGLY <br />