Laserfiche WebLink
■ <br />5'-6" <br />I VEO Baseframe <br />VUUII IV ` <br />TrueBeam <br />Plan View Stand <br />G• v <br />G° <br />el 90� k n <br />Rear <br />Outline @ Concrete Wall _ <br />TrueBeam Stand <br />I <br />Access Door I <br />to CW Valves <br />VEO BaseFrame j <br />2'-611 <br />BaseFrame Pit I : 61 <br />{ w, <br />6 24" <br />b4 <br />Z® . , -* <br />Min. to BaseFrame <br />;onduit sleeves Top of conduit Pull Box Chilled Water conduit sleeves, <br />BaseFrame <br />Ming. by Contractor. Maximum <br />length of sleeve is 86" <br />Section ( <br />Standard Cable Access Plan & Section at Pull Box <br />Scale: 1/4" = 1'-0" <br />Customer Supply & <br />Return Cooling Lines <br />BaseFrame <br />r�..n n—.- <br />[305] <br />BaseFrame Pit - Isometric View <br />Scale: 1 /4" = 1'-011 <br />Terminate cooling <br />water supply and <br />return lines with <br />1" female NPT valves <br />!Rear of Base Frame Pit <br />'3leeves, Contractor -Provided, <br />ie BaseFrame but before final <br />sleeve length 86"). Used for the <br />J Chilled Water Hose Kit. <br />NOTE: NEC AND LOCAL CODE CLEARANCES ARE NOT <br />REPRESENTED. CUSTOMER'S DESIGN TEAM IS <br />RESPONSIBLE FOR CODE COMPLIANCE. <br />9'-11 " <br />3'-11 f - <br />Service <br />Clearance <br />Mew <br />®®— ®®®- 1611 <br />L — ---� <br />Modulator <br />Pull Box <br />ELEVATION <br />Standard Modulator Cabinet <br />Scale: 3/8" = 1'-0" <br />Varies <br />311 <br />