Laserfiche WebLink
I <br />w <br />El <br />m <br />I <br />N <br />p <br />SPECIAL INSPECTION SCHEDULES <br />TASK- INDICATES WHETHER TO OBSERVE OR PERFORM (OR BOTH) THE INSPECTION TASK. <br />D THE * "R SHALL PREPARE REPORTS RICATING THAT THE WORK HASBEEN RO D IN ACCORDANCE <br />THE CONTRACT DOCUMENTS. <br />0 - THESE FUNCTIONS ON A RANDOM, DAILY BASIS, OPERATIONS NEED NOT BE DELAYED PENDING INSPECTIONS. FREQUENCY <br />OF OBSERVATIONS SHALL BE ADEQUATE TO CONFIRM THAT THE WORK HAS BEEN PERFORMED INACCORDANCE WITH THE <br />APPLICABLE DOCUMENTS. <br />P - PERFORM=tom EACH JOINT OR PRIOR O THE FINAL ACCEPTANCE F THE ITEM. <br />QC - TASKS INDICATED AS "QC" SHALL BE EXECUTED BY THE FABRICATOR AND ERECTOR IN ACCORDANCE WITH AISC 360 CHAPTER N. <br />QA - TASKS INDICATED AS "QA" SHALL BE EXECUTED BY THE SPECIAL INSPECTOR IN ACCORDANCE WITH AISC 360 CHAPTER N. <br />ITEM <br />CONTINUOUS <br />PERIODIC <br />REFERENCE <br />IBC REFERENCE <br />REMARK <br />STANDARD <br />1. FRP MATERIALS <br />X <br />ACI 440 <br />SEE MANUFACTURER'S REQUIREMENTS <br />2. FRP PLACEMENT <br />X <br />ACI 440 <br />SEE MANUFACTURER'S REQUIREMENTS <br />3. ANCHOR INSERTS <br />X <br />DURING PLACEMENT <br />4. USE OF REQUIRED EPDXY CONCRETE <br />X <br />SEE MANUFACTURER'S REQUIREMENTS <br />5. EPDXY CONCRETE PLACEMENT <br />X <br />SEE MANUFACTURER'S REQUIREMENTS <br />6. FRP CURING <br />X <br />ACI 440 <br />SEE MANUFACTURER'S REQUIREMENTS <br />7. INSPECT ANCHORS POST -INSTALLED IN <br />HARDENED CONCRETE MEMBERS 2 <br />�. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY <br />OR UPWARDLY INCLINED ORIENTATIONS TO <br />X <br />ACI 313: 17.3.2.4 <br />RESIST SUSTAINED TENSION LOADS <br />b. MECHANICAL ANCHORS AND ADHESIVE <br />X <br />ACI 313: 17.3.2 <br />ANCHORS NOT DEFINED IN 7a <br />3. VERIFY USE OF REQUIRED DESIGN MIX <br />ACI 316: <br />1904.1, <br />CH. 19, <br />1904.2, <br />o <br />X <br />26.4.3, 26.4.4 <br />2 <br />1908., <br />1908.10 <br />1. ITEMS MARKED WITH AN "X'REQUIRE INSPECTION BY A SPECIAL INSPECTOR APPROVED BY THE BUILDING OFFICIAL, THE ENGINEER, AND THE EVERGREEN STATE COLLEGE. <br />2. TESTING AND INSPECTION REPORTS SHALL BE SUBMITTED TO THE ENGINEER, BUILDING OFFICIAL, AND CONTRACTOR. <br />INSPECTION TASKS PRIOR TO WELDING <br />REFERENCED <br />STANDARD <br />IBC <br />REFERENCE <br />INSPECTION TASKS PRIOR TO WELDING <br />QC <br />QA <br />AISC 360 CH. N <br />AND AWS D1.1 <br />1705 21 <br />WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE <br />P <br />P <br />MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE <br />P <br />P <br />MATERIAL IDENTIFICATION (TYPE / GRADE) <br />O <br />O <br />WELDER IDENTIFICATION SYSTEM' <br />O <br />O <br />FIT -UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY), JOINT PREPARATION, <br />DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL), CLEANLINESS <br />(CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION), <br />BACKING TYPE AND FIT (IF APPLICABLE) <br />O <br />O <br />CONFIGURATION AND FINISH OF ACCESS HOLES <br />O <br />O <br />FIT -UP OF FILLET WELDS, DIMENSIONS (ALIGNMENT, GAPS AT ROOT), CLEANLINESS <br />(CONDITION OF STEEL SURFACES), TACKING (TACK WELD QUALITY AND LOCATION) <br />O <br />O <br />CHECK WELDING EQUIPMENT <br />O <br />= <br />INSPECTION TASKS DURING WELDING <br />REFERENCED <br />STANDARD <br />IBC <br />REFERENCE <br />INSPECTION TASKS DURING WELDING <br />QC <br />QA <br />AISC 360 CH. N <br />AND AWS D1.1 <br />1705.2.1 <br />USE OF QUALIFIED WELDERS <br />O <br />O <br />CONTROL AND HANDLING OF WELDING CONSUMABLES, PACKAGING, EXPOSURE CONTROL <br />O <br />O <br />NO WELDING OVER CRACKED TACK WELDS <br />O <br />O <br />ENVIRONMENTAL CONDITIONS, WIND SPEED WITHIN LIMITS, PRECIPITATION AND <br />TEMPERATURE <br />O <br />® <br />WPS FOLLOWED, SETTINGS ON WELDING EQUIPMENT, TRAVEL SPEED, SELECTED <br />WELDING MATERIALS, SHIELDING GAS TYPE / FLOW RATE, PREHEAT APPLIED, INTERPASS <br />TEMPERATURE MAINTAINED (MINIMUM / MAXIMUM), PROPER POSITION (F , V , H , OH) <br />O <br />O <br />WELDING TECHNIQUES, INTERPASS AND FINAL CLEANING, EACH PASS WITHIN PROFILE <br />LIMITATIONS, EACH PASS MEETS QUALITY REQUIREMENTS <br />O <br />O <br />INSPECTION TASKS AFTER WELDING <br />REFERENCED <br />STANDARD <br />IBC <br />REFERENCE <br />INSPECTION TASKS AFTER WELDING <br />QC <br />QA <br />AISC 360 CH. N <br />AND AWS D1.1 <br />1705.2.1 <br />WELDS CLEANED <br />O <br />O <br />SIZE, LENGTH AND LOCATION OF WELDS <br />P <br />P <br />WELDS MEET VISUAL ACCEPTANCE CRITERIA, CRACK PROHIBITION, WELD / BASE -METAL <br />FUSION, CRATER CROSS SECTION, WELD PROFILES, WELD SIZE, UNDERCUT, POROSITY <br />P <br />P <br />ARC STRIKES <br />P <br />P <br />k-AREA 2 <br />P <br />P <br />BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED) <br />P <br />P <br />REPAIR ACTIVITIES <br />P <br />P <br />DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER <br />P <br />P <br />THE <br />FABRICATOR OR <br />ERECTOR, <br />.-lR APPLICABLE, SHALL MAINTAIN .1. SYSTEM <br />E BY WHICH A WELDER <br />E WHO <br />H HAS <br />. WELDED <br />'.- .D A JOINT <br />." OR <br />WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE k-AREA, VISUALLY INSPECT <br />THE WEB k-AREA FOR CRACKS WITHIN 3 INCHES OF WELD. <br />MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW -STRESS TYPE. <br />a'-f L. <br />INSPECTION TASKS PRIOR TO BOLTING REFERENCED IBC <br />STANDARD REFERENCE <br />INSPECTION TASKS PRIOR TO BOLTING QC QA <br />MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS O P <br />FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS O O <br />PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF O O <br />THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE) <br />PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL _ O O AISC 360 CH. N 1705.2.1 <br />CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION O O <br />AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS <br />PRE -INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED P O <br />AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED <br />PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER O O <br />COMPONENTS <br />INSPECTION TASKS DURING BOLTING REFERENCED IBC <br />STANDARD REFERENCE <br />INSPECTION TASKS DURING BOLTING QC QA <br />0 FO <br />FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND WASHERS <br />(IF REQUIRED) ARE POSITIONED AS REQUIRED <br />JOINT BROUGHT TO THE SNUG -TIGHT CONDITION PRIOR TO THE PRETENSIONING OPERATION O O AISC 360 CH. N 1705.2.1 <br />FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING O O <br />FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION, O O <br />PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES <br />INSPECTION TASKS AFTER BOLTING REFERENCED IBC <br />STANDARD REFERENCE <br />INSPECTION TASKS AFTER BOLTING QC QA <br />AISC 360 CH. N 1705.2.1 <br />DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P P <br />ENGINEER'S SEAL <br />EVERETT, WA 98201 <br />-O <br />CITY OF <br />_.I, A ;fir <br />EVERETT, WA <br />REVISIONS <br />NO. DATE DESCRIPTION <br />3/12/19 PERMIT RESUBMITTAL <br />4/2/19 PERMIT RESUBMITTAL <br />PROJECT PRINCIPLE: PNC <br />PROJECT MANAGER_ PNC <br />DESIGNED: <br />SSS <br />DRAWN: _ <br />EPP <br />CHECKED: <br />PNC <br />DATE: <br />03/19/2019 <br />PROJECT NUMBER: <br />262018.055 <br />SHEET TITLE <br />SPECIAL INSPECTION <br />SHEET NUMBER <br />t.Jh 7 Y ,rWsool <br />I <br />{ <br />