My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Consulting Inc. 6/10/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Osborn Consulting Inc. 6/10/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:33:38 PM
Creation date
6/23/2022 10:18:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Osborn Consulting Inc.
Approval Date
6/10/2022
Council Approval Date
6/1/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Water Quality Treatment @ 3rd Ave SE
Tracking Number
0003393
Total Compensation
$196,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Osborn Consulting Inc. 11/25/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Preliminary Plans and other Attachments <br /> City of Everett's Responsibilities <br /> • City will provide input and review comments on the draft Design Report within the agreed upon <br /> schedule. <br /> Assumptions: <br /> • The Preliminary Design Report will follow Ecology Design Deliverables guidelines as revised <br /> June 2018. Section 4—Design Requirements and Sections 6—Design Analysis will be included <br /> with the Design Report under Task 4. <br /> • The Preliminary design report will be shared with Ecology to confirm project goals,but not as the <br /> formal Design Report submittal. <br /> • A single proposed water quality facility location will be selected by the City for inclusion in the <br /> Preliminary Design Report. <br /> • The Preliminary Design Report will be approximately ten(10)pages plus appendices. The <br /> appendices will include the modeling results and the preliminary design exhibits showing the <br /> preferred alternative. <br /> • The preferred option will have no wetland impacts. <br /> Deliverables: <br /> 1. Preliminary Design Report,Draft and Final(PDF). <br /> 2. Formal response to Ecology comments. <br /> Tasks 3.5 Public Outreach <br /> Consultant will assist the City with the preparation of public outreach document to inform local property <br /> owners about the proposed improvements of this project.Documents will include project improvement <br /> graphics or project summaries for flyers. <br /> City of Everett's Responsibilities <br /> • City will be the main contact for Public Outreach. <br /> • City will be responsible for distributing/mailing project information. <br /> • City will take first pass at responding to addressing resident's questions. <br /> • City will notify the consultant when stakeholder coordination is needed. <br /> Assumptions: <br /> • Public meetings or face-to-face discussions with residents or adj cent property owners are not <br /> included in this scope. <br /> • Up to 26 staff hours are included for public outreach support. <br /> Deliverables: <br /> • Project flyers,Draft,Final(PDF). <br /> City of Everett <br /> PI Ave SE Water Quality Treatment Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.