Laserfiche WebLink
• Preliminary Plans and other Attachments <br /> City of Everett's Responsibilities <br /> • City will provide input and review comments on the draft Design Report within the agreed upon <br /> schedule. <br /> Assumptions: <br /> • The Preliminary Design Report will follow Ecology Design Deliverables guidelines as revised <br /> June 2018. Section 4—Design Requirements and Sections 6—Design Analysis will be included <br /> with the Design Report under Task 4. <br /> • The Preliminary design report will be shared with Ecology to confirm project goals,but not as the <br /> formal Design Report submittal. <br /> • A single proposed water quality facility location will be selected by the City for inclusion in the <br /> Preliminary Design Report. <br /> • The Preliminary Design Report will be approximately ten(10)pages plus appendices. The <br /> appendices will include the modeling results and the preliminary design exhibits showing the <br /> preferred alternative. <br /> • The preferred option will have no wetland impacts. <br /> Deliverables: <br /> 1. Preliminary Design Report,Draft and Final(PDF). <br /> 2. Formal response to Ecology comments. <br /> Tasks 3.5 Public Outreach <br /> Consultant will assist the City with the preparation of public outreach document to inform local property <br /> owners about the proposed improvements of this project.Documents will include project improvement <br /> graphics or project summaries for flyers. <br /> City of Everett's Responsibilities <br /> • City will be the main contact for Public Outreach. <br /> • City will be responsible for distributing/mailing project information. <br /> • City will take first pass at responding to addressing resident's questions. <br /> • City will notify the consultant when stakeholder coordination is needed. <br /> Assumptions: <br /> • Public meetings or face-to-face discussions with residents or adj cent property owners are not <br /> included in this scope. <br /> • Up to 26 staff hours are included for public outreach support. <br /> Deliverables: <br /> • Project flyers,Draft,Final(PDF). <br /> City of Everett <br /> PI Ave SE Water Quality Treatment Page 6 of 10 <br />