My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Consulting Inc. 6/10/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Osborn Consulting Inc. 6/10/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:33:38 PM
Creation date
6/23/2022 10:18:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Osborn Consulting Inc.
Approval Date
6/10/2022
Council Approval Date
6/1/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Water Quality Treatment @ 3rd Ave SE
Tracking Number
0003393
Total Compensation
$196,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Osborn Consulting Inc. 11/25/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tasks 6.1 Management Reserve <br /> Work may include,but is not limited to addressing additional efforts required for defined tasks when <br /> authorized by the owner. The fee estimated is based on 10%of Tasks I through 5. <br /> General Assumptions <br /> • All coordination with property owners will be handled by the City. <br /> • No roadway widening will be required. <br /> • Utility relocation design will be provided by utility owner. <br /> • Grant management and grant closeout will be handled by the City. <br /> • Material testing during construction will be coordinated and provided by the City. <br /> • Flow control and water quality treatment will not be required for the stormwater improvements <br /> sites.Water quality treatment will be based on a retrofit approach. <br /> • On-Site Stormwater Management BMPs will not be required for site improvements. <br /> • The proposed improvements will be located within the City right-of-way or within existing City <br /> easements. <br /> • Any existing encroachments in the right-of-way will be resolved by the City. <br /> • Writing of legal descriptions and legal exhibits for additional easements will not be required. <br /> • The proposed improvements will not require stream or wetland field investigations or critical area <br /> analysis. <br /> • SWPPP will be developed by the Contractor through requirement in the specifications. <br /> • Design review meeting with Ecology will not be required. <br /> • Minor comments on Draft Design Report will not require resubmittal of the report to Ecology. <br /> • Ecology project closeout and Construction Completion Form will be provided by the City. <br /> City of Everett <br /> 3rd Ave SE Water Quality Treatment Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.