Laserfiche WebLink
Tasks 6.1 Management Reserve <br /> Work may include,but is not limited to addressing additional efforts required for defined tasks when <br /> authorized by the owner. The fee estimated is based on 10%of Tasks I through 5. <br /> General Assumptions <br /> • All coordination with property owners will be handled by the City. <br /> • No roadway widening will be required. <br /> • Utility relocation design will be provided by utility owner. <br /> • Grant management and grant closeout will be handled by the City. <br /> • Material testing during construction will be coordinated and provided by the City. <br /> • Flow control and water quality treatment will not be required for the stormwater improvements <br /> sites.Water quality treatment will be based on a retrofit approach. <br /> • On-Site Stormwater Management BMPs will not be required for site improvements. <br /> • The proposed improvements will be located within the City right-of-way or within existing City <br /> easements. <br /> • Any existing encroachments in the right-of-way will be resolved by the City. <br /> • Writing of legal descriptions and legal exhibits for additional easements will not be required. <br /> • The proposed improvements will not require stream or wetland field investigations or critical area <br /> analysis. <br /> • SWPPP will be developed by the Contractor through requirement in the specifications. <br /> • Design review meeting with Ecology will not be required. <br /> • Minor comments on Draft Design Report will not require resubmittal of the report to Ecology. <br /> • Ecology project closeout and Construction Completion Form will be provided by the City. <br /> City of Everett <br /> 3rd Ave SE Water Quality Treatment Page 10 of 10 <br />