Northwest Corporation Inc. 6/10/2022 Change Order 2
>
Contracts
>
Capital Contract
>
Northwest Corporation Inc. 6/10/2022 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:41:20 AM
Creation date
6/23/2022 10:41:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Corporation Inc.
Approval Date
6/10/2022
Department
Public Works
Department Project Manager
Souheil Nasr/Keith Alewine
Subject / Project Title
Port of Everett Combined Sewer Main Impvts
Public Works WO Number
UP3768
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0003148
Total Compensation
$476,722.77
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Northwest Construction 1/18/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: POE Combined Sewer Main Improvements <br /> Change Order No. 2 <br /> Change Order Effective Date: May 2, 2022 <br /> EXHIBIT A—DESCRIPTION OF CHANGED WORK <br /> This Change Order No. 2 adds two (2) new items and modifies two (2)existing bid items to the <br /> Contract, as described below. <br /> ADDED ITEMS <br /> New Item # 103—Encase 42"x42"x24" Tee in Concrete. Add new item entitled, "Encase <br /> 42"x42"x24"Tee in Concrete"at the agreed to Lump Sum Price of$2,485.00, resulting in a <br /> Contract increase of$2,485.00. <br /> New Item # 104—Manhole#6 Lid Replacement. Add new item entitled, "Manhole # 6 Lid <br /> Replacement" at the agreed to Lump Sum price of$5,203.00, resulting in a Contract increase of <br /> $5,203.00 <br /> MODIFIED BID ITEMS <br /> Bid Item #5—Removal of Structures and Obstructions. Modify Bid Item# 5 entitled, <br /> "Removal of Structures and Obstructions" at the Contract unit price of$1,700.00/Ton, by adding <br /> 100 Tons to the Contract,resulting in a$170,000.00 increase to the Contract price. <br /> Bid Item # 13—Special Industrial Waste. Modify Bid Item# 13 entitled, "Special Industrial <br /> Waste" at the Contract unit price of$67.50/Ton, by adding 3,750 Tons to the Contract, resulting <br /> in a$253,125.00 increase to the Contract price. <br /> JUSTIFICATION <br /> New Item # 103—Encase 42"x42"x24" Tee in Concrete. The manufacturer's recommendation <br /> was to encase this Tee in concrete and the engineer agreed, as stated in RFI # 11. <br /> New Item # 104—Manhole#6 Lid Replacement. The original manhole lid conflicted with the <br /> Flange Tee inside the structure, so a replacement lid needed to be installed that met the 100 Kip <br /> load requirement. This new item is being added to account for additional costs to purchase a new <br /> manhole lid casting. <br /> Bid Item # 5—Removal of Structures and Obstructions. This bid item exceeded plan <br /> quantity and is being modified to account for additional quantities to this bid item. <br /> Bid Item # 13—Special Industrial Waste. This bid item exceeded plan quantity and is being <br /> modified to account for additional quantities of Special Industrial Waste. <br />