Laserfiche WebLink
• <br /> DAILY FORCE ACCOUNT RECORD <br /> EVERETT <br /> WAIxixarox <br /> WORK ORDER NO. #UP 3730 <br /> PROJECT:Water Main Replacement V ITEM NO. 4 <br /> WORK AUTHORIZED BY: COE PAY ESTIMATE NO. 10 <br /> CONTRACTOR:Thomco Construction PRIME(0)OR SUB(1) 0 <br /> DATE: 4/1/2022 WEATHER: OR SERVICE(2) <br /> DESCRIPTION OF WORK: Bid set of plans and specifications did not require field lock gaskets for the installation of water main <br /> pipe on this project. The For Construction plans did require field lock gaskets,so this reimburses the contract <br /> LABOR <br /> NAME CLASSIFICATION I REG TIME I OT TIME I TOTAL AMOUNT <br /> EQUIPMENT <br /> DESCRIPTION(year,make,model,gas/diesel,gvw,etc.) REG TIME SB TIME TOTAL AMOUNT <br /> MATERIAL <br /> DESCRIPTION INVOICE NO. QUANTITY UNIT PRICE TOTAL AMOUNT <br /> Core and Main Field Lock Gaskets-8 inches F147712 44 $ 88.88 $ 3,910.72 <br /> Core and Main Field Lock Gaskets-12 inches P091197 5 $ 129.08 $ 645.40 <br /> SUBCONTRACTOR <br /> NAME INVOICE NO. TOTAL AMOUNT <br /> Total $ - <br /> SERVICE <br /> NAME INVOICE NO. TOTAL AMOUNT <br /> LABOR $ - <br /> 29%PROFIT&OH $ - <br /> CONTRACTOR REP EQUIPMENT $ - <br /> 21%PROFIT&OH $ - <br /> MATERIAL $ 4,556.12 <br /> 21%PROFITS&OH $ 956.79 <br /> TITLE SUBTOTAL $ 5,512.91 <br /> 12%MARKUP TO PRIME FOR SUB $ - <br /> 21%MARKUP TO PRIME FOR SERV. $ - <br /> MATERIALS USE TAX <br /> SHANE CAVANAH-CITY OF EVERETT INSPECTOR TOTAL $ 5,512.91 <br />