Laserfiche WebLink
THOMCO CONSTRUCTION, INC Summary <br /> COE Water Main V <br /> Date: 04/06/22 <br /> TC# 29 <br /> Description of Work: <br /> The project bid plans did not call out for field lock gaskets.The for construction plans did. <br /> LABOR Rate/Hr Amount <br /> Scott Wilcox 0 Hrs 80.70 0.00 <br /> Total Labor Cost 0.00 <br /> MATERIALS <br /> Core&Main#P147712 44 EA 88.88 3,910.72 <br /> Core&Main#91197 5 EA 129.08 645.40 <br /> 0.00 <br /> Total Material Cost 4,556.12 <br /> EQUIPMENT Hrs Units Rate/Hr Standby/Hr Amount <br /> Hrs $0.00 <br /> Total Equipment Cost 0.00 <br /> COST SUMMARY <br /> Labor 0.00 <br /> Mark on Labor 29% 0.00 <br /> Material 4,556.12 <br /> Mark up on Material 21% 956.79 <br /> Material Use Tax 0.0% 0.00 <br /> Equipment 0.00 <br /> Mark up on Equipment 21% 0.00 <br /> Total Costs Force Account 5,512.91 <br /> Total Costs Force Account 5,512.91 <br /> This work requires days be added to the contract <br /> City of Everett Inspector Signature Thomco Signature <br />