Laserfiche WebLink
NE 114 OF NW 114 OF ® TWA , <br />WK <br />STORM DRAINAGE NOTES <br />WATER NOTES <br />1e NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, <br />A. <br />NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY <br />OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND <br />MEANS OF AN APPROVED BACKFLOW PREVEN77ON DEVICE PRIOR TO <br />ACCEPTED BY 7HIE CITY OF EVERETT <br />SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF <br />SATISFACTORY BACTERIOLOGICAL TEST RESULT <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF ERETT <br />DESIGN AND CONS7RUC7TON STANDARDS AND SPEC/FICA 77ONS AND THE <br />B. <br />CONNEC77ONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE <br />WSDOT / APW A STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND <br />PUBLIC WORKS DEPARTWENT AT TIME DEVELOPER'S EXPENSE. THE <br />MUNICIPAL CONSTRUCTION (CURRENT E0I770N). <br />PUBLIC WORKS DEPAR7MENT SHALL DE GIVEN AT LEAST 5 BUSINESS <br />DAYS NOTICE FOR EACH CONNECTION THE PUBLIC WORKS <br />J. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED <br />DEPARTMENT SMALL THEREAFTER DETERMINE 774E DATE AND 77ME AT <br />FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE THE <br />WHICH THE CONNECTION SHALL BE MADE. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS <br />AND TO AVOID DAMAGE TO ANY ADDITIONAL UTIL177ES SHOWN IF <br />C. <br />ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT <br />CONFLICTS Wl TH EXIS77NG U77LI77ES ARISE DURING CONSTRUCTION, THE <br />STANDARDS <br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY <br />CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER <br />D. <br />A PRE—CONS7RUCTION MEETING SHALL BE HELD WITH 7HE CITY PRIOR <br />PRIOR TO COMMENCEMENT OF ,RELATED CONS7RUC770N ON THE <br />TO 7HIE START OF CONSTRUCTION THE CITY OF ERETT PUBLIC <br />PROJECT. <br />WORKS CONSTRUCTION DIWS1ON MUST BE NOTIFIED AT LEAST 24 <br />HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION <br />4, ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT—OF—WAY OR IN <br />EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR <br />E. <br />THE DEVELOPER OR TIME DEVELOPER'S AUTHORIZED AGENT SMALL <br />TO STARTING CONS7RNC77ON. <br />NOTIFY THE PUBLIC WORKS DEPAR7MENT OF A PERSON WHO CAN BE <br />CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 <br />5. ALL CATCH BASIN GRA TES MUST BE S7ENCILED OR STAMPED "DUMP <br />DOUR BASIS <br />NO WASTE; DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR <br />ILAND. " CHOOSE APPROPRIATE FEATURE FOR THE PROJECT <br />F <br />MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES <br />VEER77CAL SEPARATION BETWEEN POTABLE AND NON —POTABLE <br />CONVEYANCE SYSTEMS <br />G. <br />ALL CITY OF EVERETT VALVES SHALL BE OPERA TED BY PUBLIC WORKS <br />SOIL QUALITY NOTES <br />DEPAR7MENT PERSONNEL ONLY ALL VALVES, NEW AND EXIS77NG, <br />ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN <br />SHALL BE ACCESSIBLE AT ALL TIMES <br />COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE <br />FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE SMALL, AT <br />PROJECT COMPLE770N, DEMONSTRATE THE FOLLOWING; <br />TESC NO TES <br />1® A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 10% <br />1. <br />APPROVAL OF THIS EROSIONISEDIMENTATION CONTROL (ESC) PLAN <br />DRY WEIGHT IN PLANTING BEDS, AND 57 ORGANIC MATTER CONTENT IN <br />DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR <br />TURF AREAS, AND A pH FROM 6.0 TO 8. 0 OR MATCHING THE pH OF <br />DRAINAGE DESIGN (E.G.SIZE AND LOCATION OF ROADS, PIKES, <br />THE UNDISTURBED SOIL® THE TOPSOIL LAYER SHALL HAVE A MINIMUM <br />RE57RICTORS, CHANNELS, DETENTION FACILITIES, UTIL1 T7ES), <br />DEPTH OF 8 INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH/ OF <br />INCORPORA77ON OR AMENDMENTS NEEDED TO MEET 774E CRITERIA. <br />2 <br />THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONS UCT7ON, <br />SUB®SOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST <br />MAINTENANCE, REPLACEMENT, AND UPGRADING OF ESE ESC FACILITIES <br />4 INCHES WITH SOME INCORPORA 77ON OF THE UPPER MA 7E"RIAL TO <br />IS TIME RESPONSIBILITY OF THE APPLICANTICON7RACTOR UN77L ALL <br />AVOID STRA77FIED LAYERS WHERE FEASIBLE <br />CONS7RUCTION IS COMPLETE® AND APPROVED AND <br />VEGETA 770NILANDSCAPING IS ESTABLISHED. <br />2> MULCH/ PLANTING BEDS W! 2 INCHES OF ORGANIC MATTER <br />3. <br />THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL <br />BE CLEARLY FLAGGED IN 774E FIELD PRIOR TO CONSTRUCTION, DURING <br />3. USE COMPOST OR OTHER MATERIALS THAT MEET THE FOLLOWING <br />THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND 7HE FLAGGED <br />ORGANIC CONTENT REQUIREMENTS <br />CLEARING LIM17SSHALL BE PERM! De THE FLAGGING SMALL BE <br />MAINTAINED BY THE APPLICANTICONTRACTOR FOR THE DURATION <br />OF CONSTRUCTION. <br />3.1. E ORGANIC CONTENT FOR "PRE —APPROVED" AMENDMENT RATES <br />CAN BE MET ONLY USING COMPOST MEETING THE COMPOST <br />4. <br />THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONS7RUCTED IN <br />SPECIFICATION FOR BMP T7 30 BIORETENT/ON PER THE 2019 DOE <br />CONJUNCTION WTH ALL CLEARING .AND GRADING ACTIV177ES, AND IN <br />MANUAL, WTV THE EXCEPT70N THAT THE COMPOST MAY HAVE UP <br />SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN <br />TO 35 B/OSOLIDS OR MANURE THE COMPOST MUST ALSO HAVE AN <br />WATER DO NOT EN TER THE DRAINAGE SYSTEM, ROAD WA YS, OR VIOLATE <br />ORGANIC MAT7ER CONTENT OF 40% TO 65Y., AND A CARBON TO <br />APPLICABLE WATER QUALITY STANDARDS <br />NITROGEN RA 770 BELOW 25. 1. THE CARBON TO NITROGEN RA 770 <br />MA Y BE A S HIGH AS 35. 1 FOR PLAN77NGS COMPOSED ENTIRELY OF <br />5® <br />THE ESC FACILITIES SHOWN ON THIS PLAN ARE 7HE MINIMUM <br />PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION. <br />REQUIREMENTS FOR ANTICIPATED S17E CONDITIONS DURING THE <br />CONSTRUCTION PERIOD, 7HESE ESC FACIL177ES SHALL BE UPGRADED AS <br />3.2. CALCULATED AMENDMENT RA TES MAY BE MET THROUGH/ USE OF <br />NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />COMPOSTED MA7ERIAL MEETING ABOVE (3.1) OR OTHER ORGANIC <br />SEDIMENT AND SEDIMENT —LADEN WATER DO NOT LEAVE THE SITE <br />MATTER AMENDED TO MEET THE CARBON TO N17ROGEN RAT70 <br />6. <br />THE ESC FACIL177ES SHALL BE INSPECTED ROUTINELY AND MAINTAINED <br />REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS <br />BY THE APPLICANTICON7RACTOR TO ENSURE THEIR CONTINUED <br />IDENTIFIED IN TABLE 220®B, TESTING PARAMETERS, IN WAC <br />FUNCTIONING, ESPECIALLY AFTER STORM EVENTS <br />1 J—J50-220. <br />Z <br />THE ESC FACILITIES ON INACTIVE SITES SMALL BE INSPEC7ED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS <br />SOIL QUALITY IMPLEMENTATION OPTIONS <br />FOLLOWING A MAJOR STORM EVENT <br />THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING <br />S. <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO <br />ONE OF THE METHODS LISTED BELOW/ <br />ACCUMULATE WITHIN A TRAPPED CATCH BASIL ALL CATCH BASINS AND <br />1® LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM <br />CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING THE <br />COMP C77ON DURING CONS7RUC770N. <br />CLEANING OPERATION SHALL NOT FLUSH! SEDIMENT LADEN WATER INTO <br />AMEND EXIS77NG SITE TOPSOIL OR SUB —SOIL EITHER AT DEFAULT <br />THE DOWNS7REAMS TE . <br />"'PRE —APPROVED" RATES, OR AT CUSTOM CALCULA 7 D RATES BASED <br />STABILIZED CONSTRUCTON ENTRANCES SHALL BE INSTALLED AT THE <br />ON TESTS OF THE SOIL AND AMENDMENT <br />o <br />BEGINNING OF CONS7RUC77ON AND MAINTAINED FOR THE DURATION OF <br />J. STOCKPILE EXIS77NG TOPSOIL DURING GRADING, AND REPLACE PRIOR TO <br />THE PROJECT ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE <br />PLANTING STOCKPILED TOPSOIL MUST ALSO BE AMENDED IF NEEDED TO <br />THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE <br />MEET THE ORGANIC MA TIER OR DEPTH REQUIREMENTS, EITHER AT A <br />PROJECT <br />DEFAUL T "PRE —APPROVED" RA TT OR A T A CUSTOM CALCULA TED RA TE <br />4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO <br />10. <br />THE CON ACTOR SHALL PROVIDE PERIODIC S7REET CLEANING TO <br />MEET THE REQUIREMENTS. <br />REMOVE DEBRIS AND SEDIMENT 7RACKED OFF THIE SITE <br />MORE THAN ONE METHOD MA Y BE USED ON DIFFERENT POR77ONS OF THE <br />11. <br />APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM <br />SAME SITE SOIL TWAT ALREADY MEETS THE DEPTH AND ORGANIC FATTER <br />ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL, <br />QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE <br />AMENDED, <br />12. <br />BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR <br />UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH <br />APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH <br />SEPTEMBER 30. <br />� <br />AM..� r 4 1- <br />:a .. �,., *+ 1 <br />z <br />466 W <br />t <br />5 u) <br />