Laserfiche WebLink
The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport©waenergycodes.com <br /> Indicate occupancy sensing or timer switch <br /> controls configured to automatically shut off <br /> heating system when area served is <br /> unoccupied <br /> . <br /> C403.1 1.2 Snow melt systems Indicate automatic controls configured to shut <br /> off system when pavement temperature <br /> exceeds 50`F and no precipitation is falling. <br /> and when outdoor air temperature exceeds <br /> 40fF <br /> C403.1 1.3 Freeze protection indicate automatic controls to shut off system <br /> system controls when outdoor temperature exceeds 40"F.or <br /> conditions protect fluid from freezing <br /> HVAC EQUIPMENT ENERGY USE METERING <br /> C 409.3.I HVAC equipment For new buildings>50,000 sf and building <br /> energy use metering additions>25,000 sf.verfiy energy use <br /> metering of all equipment used to provide <br /> space heating and cooling.dehumidification <br /> and ventilation will be provided per C409; <br /> indicate equipment eligible,for exception <br /> DOCUMENTATION AND SYSTEM SPECIFIC REQUIREMENT TO SUPPORT COMMISSIONING(CX) <br /> C408.1 Scope of mechanical for buildings with>240,000 Btu/h total <br /> systems output cooling capacity or>300,000 Btu/h <br /> commissioning total output heating capacity.indicate that all <br /> mechanical systems regardless of individual <br /> capacity arc required to be commissioned:or <br /> provide building heating/cooling capacity <br /> calculation demonstrating onstrating eligibiity for <br /> exception <br /> Indicate that all systems,equipment and <br /> controls for which the WSEC requires control <br /> functions and/or configuration to perform <br /> specific functions are included in the Cx <br /> scope <br /> C408.1.1 Cosntimisstoning indicate in plans and specifications than Cx. <br /> C408.1.4.1 requirements in per C408 is required for all applicable <br /> construction mechanical systems <br /> documents <br /> Include general summary that includes at <br /> minimum:narrative description of activites, <br /> responsibilities of the Cs team,schedule of <br /> activities including verification of project • <br /> close out documentation per C103.6.and <br /> conflict of interest plan(it required) <br /> Include in general summary that a Cx project <br /> report or Compliance Checklist(Figure <br /> C 408.1.4.1)shall be completed by the <br /> Certified Cx Professional and provided to the <br /> • owner prior to the final mechanical <br /> inspection. <br /> 21.1 2s <br />