Laserfiche WebLink
LV IV VV%Jt.V I‘CIjUII GIIICI IW IV1 VVIluncIciai a+w�a�u�y.,n�wawu��v.vu.�...�,........-. �--. ----- ------ -- <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> -Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C408.1.2.2 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> C408.2.2 Air system and Indicate in plans that air and fluid flow rate; <br /> hydronic system shall he tested and balanced within the <br /> balancing tolerances defined in the specifications; <br /> indicate systems shall be balanced in a manner <br /> to first minimize throttling losses,then <br /> • adjusted to meet design flow conditions • <br /> Air system balancing Indicate devices that provide the capability to <br /> • devices balance all supply air outlets.zone terminals <br /> and air handling equipment requiring system <br /> balancing <br /> . <br /> C4tt8.2.2.2 Hydronic system Indicate devices that provide the capability to <br /> balancing devices isolate,balance and measure flow across all <br /> hydronic equipment requiring system <br /> balancing including heating and cooling coils <br /> and pumps;or exception applied <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> YES C103.6 Documentation and Indicate in plans that project close out <br /> • <br /> project close out documentation and training of building <br /> submittal operations personnel is required for all <br /> requirements mechanical components,equipment and <br /> systems governed by this code;indicate close <br /> out documentation shall include:record • <br /> documents,O&M manuals,applicable WSEC <br /> mechanical equipment compliance reports and <br /> calculations <br /> • <br /> 2 � <br />