My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
305 SE EVERETT MALL WAY VISION WORKS 2022-06-28
>
Address Records
>
SE EVERETT MALL WAY
>
305
>
VISION WORKS
>
305 SE EVERETT MALL WAY VISION WORKS 2022-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 8:03:35 AM
Creation date
6/27/2022 3:55:19 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
305
Tenant Name
VISION WORKS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3I 8/202:Z z Page 1 I n <br /> City of Everett <br /> 6:51:58AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2202-040 Site Address 305 SE EVERETT MALL WAY <br /> Applied 2/3/2022 Applicant ROBERT GILL Lot <br /> Approved 2/4/2022 Owner GREENTREE PLAZA 18 B LLC Block <br /> Issued 2/7/2022 Contractor GILL ELECTRIC LLC Tract <br /> Parent Permit No. B2109-028 Description electrical for tenant improvement <br /> Notes na <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/7/2022 2/7/2022 ELEC SKB CORRECTION (2/7/2022 1:20 PM SKB) <br /> 03-SLAB/CONDUI Covered prior to inspection underground <br /> conduits not accepted without inspection. <br /> 2/10/2022 2/10/2022 ELEC SKB APPROVAL eTRAKiT Inspection 2/8/2022 7:19 PM robert gill <br /> 03-SLAB/CONDUI Request <br /> Contact Name:robert gill <br /> Site Address:305 SE EVERETT MALL <br /> WAY <br /> Phone:5038782018 <br /> e-Mail:gillelectric.rob@gmail.com <br /> (2/10/2022 1:45 PM SKB) <br /> 2 PVC stub ups in 2 locations towards the <br /> front north part of space. <br /> 2/17/2022 2/17/2022 ELEC 06-ROUGH SKB APPROVAL as noted 2/16/2022 9:45 PM robert gill <br /> IN <br /> Contact Name:robert gill <br /> Site Address:305 SE EVERETT MALL <br /> WAY <br /> Phone:5038782018 <br /> e-Mail:gillelectric.rob@gmail.com <br /> (2/17/2022 2:47 PM SKB) <br /> OK framing of walls pending plumbing <br /> passing the first time.If there are plumbing <br /> corrections electrical will need to be <br /> recalled in for Rough in when they are <br /> complete. <br /> 3/10/2022 3/10/2022 ELEC 07-TGRID SKB CORRECTION eTRAKiT Inspection 3/8/2022 6:56 PM robert gill <br /> Request <br /> Contact Name:robert gill <br /> Site Address:305 SE EVERETT MALL <br /> WAY <br /> Phone:5038782018 <br /> e-Mail:gillelectric.rob@gmail.com <br /> (3/10/2022 1:08 PM SKB) <br /> Properly secure all junction boxes the <br /> Supports have to be supported to the <br /> structure into grid.Probably secure all MC <br /> cables that proper intervals in the ceiling. <br /> Remove abandoned flexes from front <br /> signage etc. <br /> INSP12 CIWSYSTEMS , <br />
The URL can be used to link to this page
Your browser does not support the video tag.