My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
305 SE EVERETT MALL WAY VISION WORKS 2022-06-28
>
Address Records
>
SE EVERETT MALL WAY
>
305
>
VISION WORKS
>
305 SE EVERETT MALL WAY VISION WORKS 2022-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 8:03:35 AM
Creation date
6/27/2022 3:55:19 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
305
Tenant Name
VISION WORKS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LV I V V VVLV I lcl.1 Ull CI l ICI ILO IWI VIJI IICI V101 UTAIIWI IyO Il ll.IUull IV VI VYV I l6,I V./LA I VT VYCI J OLVI IGO%A CM Ill -- 11U1 1 111 11 0 10ICU.,y�ILVL �9L-L/'\,nil nyi ILO Iwc1„OW <br /> The fo lowing information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport©waenergycodes.com <br /> YES C408.1.2 Commissioning Include general summary of Cx plan per <br /> C408.1.2.1 requirements in C408.1.2 including:1)Narrative description <br /> C408.1.4 construction of activities;2)Responsibilities of the Cx <br /> C103.6.3 documents team;3)Schedule of activities including <br /> verification of project close out <br /> documentation per C103.6;4)Conflict of <br /> interest plan(if required) <br /> YES C408.1.2 Commissioning Include in general summary that a Cx project • <br /> C408.1.4 requirements in report and Compliance Checklist(Figure <br /> C103.6.3 construction C408.1.4.1)shall be completed by the <br /> documents Certified Cx Professional and provided to the <br /> owner prior to the final electrical inspection <br /> YES C408.4.1 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> PROJECT CLOSE-OUT DOCUMENTATION <br /> YES C103.6.3 Project close out Indicate in plans that project close out <br /> documentation documentation is required including WSEC <br /> requirements lighting compliance reports that document all <br /> interior and exterior lighting area and/or <br /> surface types,lighting power allowances and <br /> installed densities <br /> If"no"is selected for any question,provide explanation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.