My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1311 W MUKILTEO BLVD 2022-06-29
>
Address Records
>
W MUKILTEO BLVD
>
1311
>
1311 W MUKILTEO BLVD 2022-06-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2022 9:27:35 AM
Creation date
6/29/2022 9:27:13 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evalua. • NGA File No. 1295621 <br /> Tsang Slope Restoration October 21,2021 <br /> Everett,Washington Page 7 1 <br /> The restored area should be closely monitored during the upcoming wet season for signs of erosion or <br /> surficial failures,and correction measures promptly implemented should such events be experienced. <br /> Site Drainage <br /> Final site grades should allow for drainage away from the slope where possible. Straw wattles may be <br /> used to temporarily divert water from roadway or driveway areas; however, driveway pavement and <br /> grading should be employed to permanently route runoff away from the affected slope. <br /> USE OF THIS REPORT <br /> NGA has prepared this report for Sun Yee Tsang and associated agents,for use in the planning and design <br /> of the restoration activities on this site only.The scope of our work does not include services related to <br /> construction safety precautions and our recommendations are not intended to direct the contractors' <br /> methods, techniques, sequences, or procedures, except as specifically described in our letter for <br /> consideration in design. There are possible variations in subsurface conditions between the explorations <br /> and also with time. Our letter,conclusions, and interpretations should not be construed as a warranty of <br /> subsurface conditions. A contingency for unanticipated conditions should be included in the budget and <br /> schedule. <br /> We recommend that NGA be retained to provide monitoring of restoration outcomes periodically during <br /> the initial winter wet season to confirm that site restoration is adequate to minimize the risk associated <br /> with the erosion hazard associated with the property, and to provide recommendations for design <br /> changes for a successful outcome. <br /> Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br /> with generally accepted geotechnical engineering practices in effect in this area at the time this letter was <br /> prepared.No other warranty,expressed or implied,is made. Our observations,findings,and opinions are <br /> a means to identify and reduce the inherent risks to the owner. <br /> o-o-o <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.